Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published November 2, 2026 at 7:00 PM

Updated November 5, 2026

Renovation of a mixed-use development in Waupun, Wisconsin. Completed plans call for the renovation of a municipal facility.

In general, the work consists of: Demolition of pre-existing shop concrete slab and foundation structures, abandonment of decommissioned, damaged and/ or abandoned utilities, new engineered post-framed shop building to include Maintenance Bay, Office Area, Break Area Toilet Room, Tool Storage, and Utility Room for electrical, technology and plumbing services, abandonment and demolition of existing electrical service to site, coordination of new electrical service with utility (application had been made), installation of new panels and underground electrical reconnection of existing campus facilites with including site work. Bid Guarantee in the amount of 10% of the Bid must accompany each bid submitted Base Bid will be received for: A single lump sum bid for All Work' Contract offer and construction phase records will be processed electronically If a project does not include any mechanical, electrical, plumbing, or fire protection divisions of work, bidders shall bring inadequacies, omissions or conflicts to the Architects/Engineer's attention at least ten (10) days before GPC bid opening. Prompt clarification will be supplied to all bidders of record by addendum.Question Deadline 11/02/2026

GC Bidding

$783,800.00

Public - State/Provincial

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
235
Active Projects
108
Bidding Soon
1,788
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 12, 2026

March 1, 2027

Project location map

W9919 Lake Emily Rd, Waupun, WI

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed