Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published June 29, 2026 at 8:00 PM
Updated July 8, 2026
Site work and paving for a mixed-use development in Shawnee, Kansas. Conceptual plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.
In November 2023 voters approved the renewal of a 3/8 cent sales tax. One-third of this sales tax is designated for the Street Improvement Program. This program is dedicated to upgrading and improving older streets with curbs, sidewalks, drainage, lighting. A citizen task force was put together to rank streets based on 7 distinct criteria. The eligible streets are re-evaluated periodically. Eligible streets are normally ditch section streets that lack sidewalks, street lighting, and proper drainage facilities. The improvements normally involve complete removal and replacement of the existing street to include grading, widening, curb, sidewalk/ADA ramps, storm drainage facilities, pavement markings, and LED streetlight luminaires. The SIP projects for 2026-2035 were approved in December 2024 by the Governing Body. The fourth project on the approved list is Ballentine from Johnson Drive to South End (SIP). Design will commence in 2028 with construction to begin in 2029. The improvements involve complete removal and replacement of the existing street to include grading, widening, curb, sidewalk/ADA ramps, storm drainage facilities, pavement markings, and LED streetlight luminaires. Ballentine does not qualify for CDBG or CARS funding, so all funding will be provided through the SIP program. The project is included in the City's 2026-2035 Capital Improvement Program (CIP). As of June 29, 2026, further details have not yet been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.
Conceptual
$2,366,000.00
Public - City
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Ballentine St, Shawnee, KS
Related To This Project
Shawnee, KS
--
Shawnee, KS
--
Shawnee, KS
Bid Date: Jul 02 2026
Shawnee, KS
--
Shawnee, KS
--
Shawnee, KS
Bid Date: Apr 23 2026
Shawnee, KS
--
Shawnee, KS
Bid Date: Apr 23 2026
Shawnee, KS
Bid Date: Mar 20 2026
Shawnee, KS
Bid Date: Jun 25 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
