Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published July 2, 2026 at 8:00 PM
Updated July 8, 2026
Site work for a water / sewer project in San Juan, Puerto Rico. Working plans call for site work for a water / sewer project.
The outreach event will address two potential contract actions for the Guajataca Dam Permanent Repair Project, focusing on industry feedback for complex dam rehabilitation involving deep soil mixing (DSM), deep mixing methods (DMM), and other innovative ground improvement techniques. The early work effort includes utility relocations (electrical, telecommunications, water, and sewer), demolition and relocation of administrative facilities, development of traffic detour plans, and construction of a left abutment water supply siphon system along with associated incidental work. Work affecting public roads and utilities must comply with Puerto Rico Highway and Transportation Authority standards. The permanent repair project involves major construction activities to address critical structural and geotechnical risks, including embankment instability, karst voids, transverse cracking due to seismic loading, seepage and erosion concerns, and spillway overtopping. Key elements include installation of vertical cutoff walls through a very soft clay core, stabilization of embankments, integration with existing structures such as tunnels and key walls, and construction of filter berms and stabilization buttresses under challenging geologic and geometric conditions. The project will require specialized construction methods, complex logistics on the dam crest, and advanced engineering approaches to ensure long-term dam safety and performance. Location: 355 F.D. Roosevelt Avenue, San Juan, Puerto Rico 00918 Project Magnitude: For informational and bonding purposes, the estimated magnitude of this construction project is between $20M and $50M. All timely questions and official/approved answers will be made available through ProjNet. Official/approved answers to all timely questions will also be posted on the Sam.gov website in the form of a report generated from ProjNet when all answers are finalized. We appreciate your questions and feedback by 5:00 pm, AST on July 31, 2026. The Method of Contractor Selection has not been determined at this Time. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Final Planning
$50,000,000.00
Public - Federal
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
355 Avenida F.D. Roosevelt, San Juan, PR
Related To This Project
San Juan, PR
Bid Date: Jun 12 2026
San Juan, PR
Bid Date: Jun 12 2026
San Juan, PR
--
San Juan, PR
--
San Juan, PR
Bid Date: Feb 17 2026
San Juan, PR
--
San Juan, PR
Bid Date: Feb 13 2026
San Juan, PR
Bid Date: Mar 03 2026
San Juan, PR
Bid Date: May 15 2026
San Juan, PR
Bid Date: Sep 24 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
