Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published July 8, 2026 at 8:00 PM
Updated July 15, 2026
Site work, paving and renovation of a road / highway in Slinger, Wisconsin. Completed plans call for paving for a road / highway; for the renovation of a road / highway; and for site work for a road / highway.
Full depth asphaltic pavement pulverizing, base patching, excavation, aggregate base installation, geotextile soil reinforcement, HMA pavement placement, shoulder work, concrete curb and gutter installation, pavement marking, and rip rap installation. Bonds: 5% Bid Bond. This project is part of a WisDOT Local Roads Improvement Program ( LRIP) project, which consists of road improve-ments of existing road ; including hot mix asphalt pavement , crushed ag-gregate base course, re- cycled asphalt on shoul-ders, and concrete curb and gutter construction . Proposals shall not be withdrawn for a period of 45 days after the date of opening. The Town of Polk reserves the right to reject any or all of the proposals and to waive any informalities therein . This project is part of a WisDOT Local Roads Improvement Program (LRIP) project, which consists of road improvements of existing road; including hot mix asphalt pavement, crushed aggregate base course, recycled asphalt on shoulders, and concrete curb and gutter construction. The work, in general , will include the approximate quantities and items listed below: Asphaltic Pavement Pulverizing, Full Depth S.Y. 36,500 Base Patching Excavation (10%) C.Y. 2,435 Crushed Aggregated Base Patching Backfill, 1-1/4" Dense (1' Thick) Tons 2,435 Crushed Aggregated Base Patching Backfill, 3" Dense ( 1' Thick) Tons 2,435 Geotextile Soil Reinforcement, SR (10%) S.Y. 3,650 Lower Layer HMA Pavement 3" Mix Tons 6,570 Upper Layer HMA Pavement 2" Mix Tons 4,380 Shoulder - 3/4" Dense, Recycled Asphalt Tons 1,745 Removal and Disposal of Pulverized Material C.Y. 160 36" Mountable Curb and Gutter L.F. 350 36" Concrete Flume E.A. 1 Pavement Marking (2 Fog Lines, 1 Center Line) L.F. 42,100 Medium Rip Rap S.Y. 12 Traffic Control L.S. 1 Mobilization L.S. 1 Contact information and submittal procedures for such questions are as follows: A. Joshua Molter at the office of the Engineer: Cedar Corporation. Phone: 920-241-4276. Email: joshua.molter@cedarcorp.com Interpretations or clarifications considered necessary by Engineer in response to such questions will be issued by Addenda delivered to all registered plan holders. Questions received less than five days prior to the date for opening of Bids may not be answered.
Post-Bid
$400,000.00
Public - City
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Hillside Rd, Slinger, WI
Related To This Project
Slinger, WI
--
Slinger, WI
Bid Date: Jun 23 2026
Slinger, WI
Bid Date: Jun 11 2026
Slinger, WI
Bid Date: Jun 11 2026
Slinger, WI
--
Slinger, WI
--
Slinger, WI
--
Slinger, WI
Bid Date: Apr 23 2026
Slinger, WI
Bid Date: Mar 07 2019
Slinger, WI
Bid Date: Mar 12 2026
Slinger, WI
Bid Date: Feb 05 2026
Slinger, WI
Bid Date: Jul 09 2025
Slinger, WI
Bid Date: May 29 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
