Published June 9, 2026 at 8:00 PM

Updated June 12, 2026

Site work and paving for a mixed-use development in Slinger, Wisconsin. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

Approximate quantities are as follows: Common Excavation 2200 CY \ Sawcutting 270 LF \ Base Aggregate Dense 1 1/4-inch (10") 2100 TON \ HMA Pavement 1200 TON \ 30" Reinforced Concrete Curb and Gutter 510 LF \ 5" Concrete Sidewalk 1100 SF \ 7" Concrete Driveway Approach Remove/Replace 60 SY \ Storm Manhole Adjustment 6 EA \ Valve Box 8 EA \ This is a unit price contract. The estimated quantities as indicated above and on the Bid Schedule are inserted only for the purpose of determining the low bidder. The Contract letting shall be subject to the provisions of Sections 61.54, 62.15, 66.0901, and 66.0903 of the Wisconsin Statutes. This project may be partially funded as part of the Wisconsin Department of Transportation's Local Road Improvement Program. Bids shall be accompanied by Bid Security in the form of a Bid Bond, certified check, or cashier's check made payable to the Owner in an amount of five (5) percent of the Bidder's maximum Bid price. If the successful bidder fails to execute the contract and furnish the required bonds within 15 days after the Award, the Bid Security shall be forfeited to Owner as liquidated damages. No bid may be withdrawn for a period of 45 days from the date of the bid opening. All questions about the meaning or intent of the Contract Documents shall be submitted in writing to the Engineer via the email address provided on the back of the cover page of this Project Manual.Richard Gebhart Civil Engineer PHONE: (262) 317-3358 EMAIL: Richard.gebhart@rasmith.com The Owner has the right to reject any and/or all bids received, to waive any minor defects or irregularities that may be found in the bids, and to accept the bid that is in the best interest of the Owner. Bidder awarded a contract for the work shall be required to furnish a Performance Bond and a Payment Bond in the full amount of the contract price.

Post-Bid

Roads / Highways

$400,000.00

Public - City

Paving, Site Work

13

11

5

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
273
Active Projects
117
Bidding Soon
2,491
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 11, 2026

July 13, 2026

Project location map

Multiple Locations, Slinger, WI


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.