BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published July 7, 2026 at 8:00 PM

Updated July 9, 2026

Renovation of a fire / police facility in Davenport, Iowa. Completed plans call for the renovation of a 2,565-square-foot fire / police facility.

The City of Davenport is accepting bids from qualified vendors for existing flooring removal and concrete polishing at the Davenport Police Department. Measurements provided are approximate, and contractors are responsible for obtaining exact measurements. A mandatory pre-bid meeting will be held for contractors to take measurements, review the scope of work, address questions or concerns, and discuss the City's expectations. All contractors intending to bid must have a representative present at the pre-bid meeting. Bids must be submitted through the City of Davenport e-bidding system; submissions by email, fax, paper copy, or other methods are not accepted. Each section of the Invitation to Bid in the e-bidding system must be reviewed and responded to accordingly. Question Deadline 07/10/2026 at 2:00 PM CT Questions regarding the bid shall be submitted through the City of Davenport electronic submission system under the Questions tab at online Scope of Work: Base Bid: Removal and disposal of existing flooring and cove base (approx. 2,565 sq ft) Polish concrete in all areas flooring was removed The finish should be 800 grit, semi polished. Surface cut 1/16 to 1/8 inch to achieve Class C Medium Aggregate size. A densifier should be used. A seal coat should be applied. All control joints and cracks should be filled with appropriate joint filler. O A Mock-Up or demonstration area of approximate 10' x 10' to allow owner to approve exact exposure and gloss level. o Furnish and install Cove base o One-year workmanship warranty Dust containment Any additional work not in this scope will be assessed by the Project Manager and require preapproval before a change order is given. ADD Alternate: Basement Removal and disposal of existing flooring and cove base (approx. 1,776 sq ft) Polish concrete in all areas flooring was removed The finish should be 800 grit, semi polished. Surface cut 1/16 to 1/8 inch to achieve Class C Medium Aggregate size. A densifier should be used. A seal coat should be applied. All control joints and cracks should be filled with appropriate joint filler. Furnish and install Cove base One-year workmanship warranty Dust containment

Sub-Bidding

$100,000.00

Public - City

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
196
Active Projects
9
Bidding Soon
1,310
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Project location map

416 N Harrison St, Davenport, IA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.