Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published September 21, 2026 at 8:00 PM

Updated September 27, 2026

Site work, paving and new construction of a road / highway in Coleman, Wisconsin. Completed plans call for the construction of a road / highway; for site work for a road / highway; and for paving for a road / highway.

As of July 24, 2026 this project has not yet been awarded. A timeline for the award was not yet been established Roadway extension including excavation, ditching, silt fence installation, crushed aggregate base course, and mountable concrete curb and gutter. Work Covered by Contract Documents Location: Robinette Road between Maple Ln. and McArthur Dr. in the Village of Coleman, Wisconsin The Work includes: a. Excavation and grading b. Crushed Aggregate Base Course C. Concrete Curb and Gutter d . Utility Structure Adjustments e. Erosion Control Bonds: 5% Bid Bond. Question Deadline 07/18/2026 Bidder shall submit all questions about the meaning or intent of the Bidding Documents to Engineer in writing. Contact information and submittal procedures for such questions are as follows: A. Mike Kaster, PE Phone: (920) 491-9081 Email: Mike.Kaster@cedarcorp.com The work, in general , will include the approximate quantities and items listed below: o 3,000 L.F. Mountable Concrete Curb and Gutter 500 L.F. Common Excavation - Ditching o 300 C.Y. Excavation - Roadway Widening 1,000 L.F. Silt Fence 900 TONS Crushed Aggregate Base Course Award is subject to final approval.

Award

$120,029.00

Public - City

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
81
Active Projects
35
Bidding Soon
618
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 22, 2026

September 21, 2026

Project location map

Robinette Road, Coleman, WI

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed