Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published July 29, 2026 at 8:00 PM
Updated August 1, 2026
Site work for a municipal facility in Vancouver, Washington. Completed plans call for site work for a municipal facility.
Installation of fencing at the Downtown project location. Question Deadline 08/07/2026 Questions about or requests for clarification or interpretation of the RFP documents shall be made by email to the School's Legal Counsel, with a copy to the Project Architect, at the email addresses specified School's Designated Representative. Dr. Chad Denker, Superintendent of Schools, David City Public Schools, 750 D Street, David City, Nebraska, 68632. B. Project Architect. Clark & Enersen, Inc., 1010 Lincoln Mall , Suite 200, Lincoln, NE 68508. The Project Architect's designated lead representative on the Project Team is Tim Ripp; Tel : 402-477-9291 ; Email : tim.ripp@clarkenersen.com. C. School's Legal Counsel. Derek A. Aldridge, Perry, Guthery, Haase & Gessford, P.C., L.L.O., 233 South 13th Street, Suite 1400, Lincoln, NE 68508; Tel : 402-476-9088; Email: daldridge@perrylawfirm.com. 1. Any concrete, asphalt, bricks, etc. removed or damaged by the contractor shall be replaced by the contractor. This includes but not limited to; trenching for conduits, digging for bollard placements, removing for proper fit of fencing, any other excavation, etc. 2. All utility locates must be called in by the contractor. 3. Wiring readers and openers shall be as follows: . 18/6 cable to each card reader o 18/2 cable to each latch and/or gate opener All low voltage wire shall be ran in 1 1/4 " piping All required electrical shall be ran in 1 " piping 4. All electrical and low voltage must be fed from their respective buildings depending on their location. Facilities Management will assist in working with the contractor to determine where the locations are All wiring, conduit, devices, etc. must be run according to current electrical codes. 6. All access control panels for this project must be a Honeywell MPA-4 (MPA4MPSU). See Exhibit B. 7. All access control readers must be Essex Electronics IRXO-1B. See Exhibit C. 8. If an electric strike is used without a gate opener, an Altronix AX-AL400UCL power supply must be used. See Exhibit D. 9. There shall be a total of three (3) man gates. Two (2) single-man gates One (1) double-man gate Project Questions shall be directed in writing to Ryan Schmit with Facilities Management at Ryan.Schmit@clark.wa.gov The question(s) will be logged with the answer(s) and posted to our website
Bid Results
$242,948.00
Public - County
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 28, 2026
September 28, 2026
Multiple Locations, Vancouver, WA
Related To This Project
Vancouver, WA
--
Vancouver, WA
--
Vancouver, WA
Bid Date: Aug 04 2026
Vancouver, WA
Bid Date: Aug 04 2026
Vancouver, WA
Bid Date: Aug 04 2026
Vancouver, WA
Bid Date: Aug 07 2026
Vancouver, WA
Bid Date: Aug 04 2026
Vancouver, WA
Bid Date: Aug 11 2026
Vancouver, WA
Bid Date: Jul 21 2026
Vancouver, WA
--
Vancouver, WA
Bid Date: Jul 21 2026
Vancouver, WA
--
Vancouver, WA
--
Vancouver, WA
Bid Date: Jul 21 2026
Vancouver, WA
Bid Date: Jul 21 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
