Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published October 6, 2026 at 8:00 PM

Updated October 24, 2026

Site work, paving and outdoor lighting for a civil project in Maple Valley, Washington. Completed plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; for outdoor lighting for a road / highway; and road / highway.

The Work shall be completed within 390 working days from the date of Notice to Proceed in which the City is prepared to issue as soon as December 2026. The Work shall consist of fur-nishing all materials, equipment, tools, labor, and other work or items incidental thereto for: The project will provide a pedestrian bridge across SR 169 near SE 258th Street and will include a new covered main span over the highway, ADA approach ramps on both sides, staircases, electrical, lighting, landscaping. irrigation, drainage, utility relo cations, a new driveway cut onto SR 169, and a play area. The work includes, but is not limited to the following: Bridge and approach ramp construction, including piers and abutments Drilled shaft construction Civil site work Landscaping and irrigation Electrical and electrical coordination with PSE Lighting Railings Stormwater conveyance and treatment facilities Waterline Relocation Coordination with Play Area Contractor This project is federally, state, and locally funded. The City of Maple Valley appreciates partnerships with the Federal Highway Administration and the Transportation Alternatives Program, Washington State's Move Ahead Washington and Public Works Board, and King County Parks. The estimated cost of this proj ect is in the range of $10 to $12 million. All bid proposals shall be accompanied by a bid proposal deposit in cash, certified check. cashier's check, or surety bond in an amount equal to five percent (5%) of the total amount of such bid proposal, including sales tax. Should the successful bidder fail to enter into such contract and furnish satisfactory payment and performance bonds within the time stated in the Contract Documents, the bid proposal deposit shall be forfeited to the City of Maple Valley. Small, minority and women-owned business are encouraged to participate in the bidding as prime contractors, subcontractors, or suppliers. The City reserves the right to reject any and all bids and to waive any informalities or irregu-larities in the bid or in the bidding process, and make the award as deemed to be in the best interest of the City. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Post-Bid

$12,000,000.00

Public - City

Our team is requesting plans for this project.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
261
Active Projects
115
Bidding Soon
2,114
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 21, 2026

December 1, 2026

Project location map

WA-169, Maple Valley, WA


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed