Site work and new construction of a mixed-use development in Maple Valley, Washington. Completed plans call for the construction of a water / sewer project; municipal facility; and for site work for a municipal facility.

Installation of a pilot-scale micro-electrolysis (ME) treatment system for industrial wastewater from the landfill methane processing plant, including reactor foundation, piping, valves, instrumentation, and utility connections. The pilot-scale ME project, which targets arsenic in industrial wastewater from the methane processing plant located at CHRLF, is part of the overall leachate and lagoon improvements project at CHRLF. The pilotscale ME technology and treatment system has been selected to pretreat the industrial wastewater stream from the methane processing plant prior to the stream entering the leachate lagoon pretreatment system. The experimental ME technology was developed by the University of Washington (UW) and designed at current scale by WSP USA (WSP). CHRLF discharges industrial wastewater collected at the landfill to the King County publicly owned treatment works (POTW) in Renton, Washington, under Waste Discharge Permit No. 7842-04 (discharge permit), issued to the County by the King County Industrial Waste (KCIW) program . The Work includes but is not limited to the following features: 1. Obtain all permits necessary to perform the Work. 2. Furnish and installation of ME reactor and platform foundation slab and stairway foundation slab, including all required anchoring. 3. Furnish and installation of pilot-scale ME treatment system equipment, interconnecting piping and valves, and instrumentation. 4. Furnish initial bulk chemicals and media. 5. Installation of site utility hookups to existing onsite power, including underground and above-grade connection points for the pilot system and associated installations. 6. Hydrostatic and leak testing. 7. Pre-commissioning, commissioning, inspections, and final system testing. Engineer's Estimate: $966,400.00 Request for Information: Submit all inquiries via email to the Contract Specialist and cc the Alternate Contract Specialist. No verbal answers by any County personnel or its agents and consultants will be binding on the County. Contract Specialist: Annette Hansford, ahansford@kingcounty.gov, 206-492-6395 Alternate Contract Specialist: Isaac Johnson, isjohnson@kingcounty.gov, 206-477-6618

GC Bidding

$966,400.00

Public - County

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
259
Active Projects
106
Bidding Soon
2,023
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 10, 2026

December 10, 2026

Project location map

16645 228th Ave SE, Maple Valley, WA

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed