Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Create your *free account*
Fill in a few details to keep viewing projects.
You've used your *free project views*
Register today to keep viewing commercial construction projects bidding in your area.
With ConstructConnect Project Intelligence, you can:
- Filter 825,000+ active commercial projects down to the ones that fit your trade and area
- Reach the right people with contact info for 575,000+ construction companies
- See who's bidding before you put in the hours
- Get daily email updates and alerts on the projects you're watching
Published October 28, 2026 at 8:00 PM
Updated November 2, 2026
Site work and new construction of a mixed-use development in Maple Valley, Washington. Completed plans call for the construction of a water / sewer project; municipal facility; and for site work for a municipal facility.
Installation of a pilot-scale micro-electrolysis (ME) treatment system for industrial wastewater from the landfill methane processing plant, including reactor foundation, piping, valves, instrumentation, and utility connections. The pilot-scale ME project, which targets arsenic in industrial wastewater from the methane processing plant located at CHRLF, is part of the overall leachate and lagoon improvements project at CHRLF. The pilotscale ME technology and treatment system has been selected to pretreat the industrial wastewater stream from the methane processing plant prior to the stream entering the leachate lagoon pretreatment system. The experimental ME technology was developed by the University of Washington (UW) and designed at current scale by WSP USA (WSP). CHRLF discharges industrial wastewater collected at the landfill to the King County publicly owned treatment works (POTW) in Renton, Washington, under Waste Discharge Permit No. 7842-04 (discharge permit), issued to the County by the King County Industrial Waste (KCIW) program . The Work includes but is not limited to the following features: 1. Obtain all permits necessary to perform the Work. 2. Furnish and installation of ME reactor and platform foundation slab and stairway foundation slab, including all required anchoring. 3. Furnish and installation of pilot-scale ME treatment system equipment, interconnecting piping and valves, and instrumentation. 4. Furnish initial bulk chemicals and media. 5. Installation of site utility hookups to existing onsite power, including underground and above-grade connection points for the pilot system and associated installations. 6. Hydrostatic and leak testing. 7. Pre-commissioning, commissioning, inspections, and final system testing. Engineer's Estimate: $966,400.00 Request for Information: Submit all inquiries via email to the Contract Specialist and cc the Alternate Contract Specialist. No verbal answers by any County personnel or its agents and consultants will be binding on the County. Contract Specialist: Annette Hansford, ahansford@kingcounty.gov, 206-492-6395 Alternate Contract Specialist: Isaac Johnson, isjohnson@kingcounty.gov, 206-477-6618
GC Bidding
$966,400.00
Public - County
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
November 10, 2026
December 10, 2026
16645 228th Ave SE, Maple Valley, WA
Related To This Project
Maple Valley, WA
Bid Date: Oct 21 2026
Maple Valley, WA
Bid Date: Jul 07 2026
Maple Valley, WA
--
Maple Valley, WA
--
Maple Valley, WA
--
Maple Valley, WA
Bid Date: Feb 10 2026
Maple Valley, WA
Bid Date: Jan 13 2026
Maple Valley, WA
Bid Date: Jul 07 2026
Maple Valley, WA
Bid Date: Dec 02 2025
Maple Valley, WA
Bid Date: Oct 28 2025
Maple Valley, WA
Bid Date: Oct 15 2025
Maple Valley, WA
Bid Date: Jun 26 2025
Maple Valley, WA
Bid Date: Jun 25 2025
Maple Valley, WA
Bid Date: Jun 06 2025
Unlock the Full Project List
Access every active project near you — get started today.
- 825,000+ active commercial projects tracked daily
- Verified contact info for the GC, owner, and architect
- New leads delivered to your inbox every morning
Create your account to get started.
Takes less than a minute — no credit card needed