Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published July 16, 2026 at 8:00 PM
Updated July 22, 2026
Renovation of a military facility in Aurora, Colorado. Conceptual plans call for the renovation of a military facility.
Provide all labor, equipment, materials, engineering, and certified personnel necessary to perform a complete replacement of the chilled water system serving a secure 24/7 operations server room facility. Work includes performing professional engineering cooling load calculations in accordance with UFC 3-410-01 to determine final system capacity and developing a replacement design standardized on Trane-series equipment. The project requires decommissioning, refrigerant recovery, and removal of the existing chilled water system and two existing Computer Room Air Handlers (CRAHs). The contractor shall procure, install, test, and commission one new Trane-series water chiller with an integrated air-cooled condenser and two new chilled-water CRAHs serving the secure server room. Continuous and redundant temporary cooling must be provided throughout construction to ensure zero downtime and maintain required server room operating temperatures. Work also includes integration of all new controls into the existing base-wide Energy Management Control System (EMCS) in accordance with Base EMCS Standards and UFC 3-410-02; connection to the existing 460V, 60 Hz, three-phase electrical service; system startup, testing, balancing, and commissioning; and all associated piping, controls, electrical, and mechanical work required for a fully operational system. The replacement equipment must accommodate existing site constraints, including placement on the current chiller pad or extension of the pad if required, compliance with structural weight limitations, and delivery and installation through restricted interior access routes with limited doorway clearances. All personnel must satisfy security requirements, including NCIC background checks, OPSEC compliance, and completion of AT Level I training prior to gaining facility access. Location: Federal Installation, Colorado. The Method of Contractor Selection has not been determined at this Time
Conceptual
$400,000.00
Public - Federal
We’ve obtained documents for this project and are currently processing them.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
To Be Determined, Aurora, CO
Related To This Project
Aurora, CO
Bid Date: Jul 31 2026
Aurora, CO
--
Aurora, CO
Bid Date: Aug 17 2026
Aurora, CO
Bid Date: Aug 11 2026
Aurora, CO
Bid Date: Aug 18 2026
Aurora, CO
Bid Date: Sep 02 2026
Aurora, CO
Bid Date: Jul 27 2026
Aurora, CO
--
Aurora, CO
--
Aurora, CO
Bid Date: Jul 22 2026
Aurora, CO
Bid Date: Aug 12 2026
Aurora, CO
Bid Date: Jul 23 2026
Aurora, CO
Bid Date: Jul 23 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
