Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published September 28, 2026 at 8:00 PM
Updated October 1, 2026
Renovation of a military facility in Aurora, Colorado. Completed plans call for the renovation of a military facility.
Replacement of the existing chilled water system and two (2) computer room air handlers (CRAHs). The new chiller system shall consist of Trane-series equipment in accordance with Air Force Civil Engineering installation standardization guidance. The contractor shall provide all labor, materials, equipment, and services necessary to complete the replacement and installation work as detailed in the Statement of Work. Location: Buckley Space Force Base, Aurora, Colorado 80011. Question Deadline 09/03/2026 at 10:00 AM MT Questions following the site visit will be due to Contracting Officer (TSgt Matthew Kennedy, matthew.kennedy.24@spaceforce.mil) and Contract Specialist (2d Lt Maurice Epps, maurice.epps@spaceforce.mil). Chilled Water System Replacement The contractor is responsible for providing all material and qualified labor necessary for the completion of this project. The contractor shall: o o Base the design of the chiller system on Trane-series equipment to support the Government's goal of equipment standardization. Replace the chiller along with all necessary associated distribution. Provide and install new Trane chiller system meeting the following technical specifications: O Physical footprint must fit onto the existing concrete pad (19 ' - 11 " L x 12 - 8" W x 6 "-8" H"). If the equipment exceeds these dimensions , the pad shall be extended to accommodate the new equipment. The operational weight of the new chiller system must not exceed the existing concrete pad's load capacity of 12,000 lbs. System Capacity to be determined by existing Chiller, CRAHs, and sequence of operations. Must integrate into the existing electrical 460V, 60 Hz, 3-Phase power supply and comply with all the applicable requirements in UFC 3-501-01. Provide and install all piping tie-ins, isolation valves, glycol feeder and other components required to integrate the new chiller into the existing chilled water distribution system. Provide and install emergency chilled water tap connections, isolation valves, and quick-connect fittings to facilitate the rapid integration of a temporary chiller in the event of primary system failure. Flush the chilled water distribution system and recharge with a 30% propylene glycol and water solution. The refrigerant type must comply with the environmental requirements specified in UFC 3-401-01, Section 2-5. Sound and vibration control must comply with the requirements in UFC 3-410-01, Section 2-19. O Must integrate into existing base Energy Management Control System (EMCS) and meet all applicable requirements in UFC 3-410-01 , UFC 3- 410-02 and EMCS Standards 26AUG2026.
Post-Bid
$4,000,000.00
Public - Federal
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 28, 2026
October 28, 2026
606 Aspen St, Aurora, CO
Related To This Project
Aurora, CO
Bid Date: Jul 31 2026
Aurora, CO
Bid Date: Sep 16 2026
Aurora, CO
Bid Date: Sep 03 2026
Aurora, CO
Bid Date: Aug 11 2026
Aurora, CO
Bid Date: Aug 18 2026
Aurora, CO
Bid Date: Sep 02 2026
Aurora, CO
Bid Date: Jul 27 2026
Aurora, CO
Bid Date: Aug 14 2026
Aurora, CO
Bid Date: Sep 10 2026
Aurora, CO
Bid Date: Jul 22 2026
Aurora, CO
Bid Date: Aug 14 2026
Aurora, CO
Bid Date: Jul 23 2026
Aurora, CO
Bid Date: Jul 23 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
Unlock the Full Project List
Access every active project near you — get started today.
- 825,000+ active commercial projects tracked daily
- Verified contact info for the GC, owner, and architect
- New leads delivered to your inbox every morning
Create your account to get started.
Takes less than a minute — no credit card needed
