Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published July 31, 2026 at 8:00 PM
Updated August 2, 2026
Site work and paving for a mixed-use development in Aurora, Minnesota. Completed plans call for site work for a water / sewer project; water / sewer project; sidewalk / parking lot; and road / highway.
The work includes the construction of approximately 260 LF RC Arch Pipe Culvert, 295 LF RC Storm Sewer, 160 LF 42” RC Sewer - Jacked, 14 EA Precast Storm Sewer Manholes, 720 TONS Bituminous Pavement, and 275 LF PVC Watermain. Categories include sanitary sewer (gravity), water utilities, trenchless utility construction, culverts, waterways, stormwater channels, construction, sidewalks, curbs, gutters, drainage, dredging, ditches and canals, concrete walkway, sawcutting sidewalk pavement, fittings and valves, traffic control, fire hydrant, grade and surface, stormwater improvements, street road intersection improvements, directional bore, storm drain and paving, street roadway reconstruction, trails and or multipurpose trails, utility street construction and excavation, sewer and water construction, sitework excavating and grading, grubbing & clearing. All bids will be received online through QuestCDN.com. Digital plans are available for a download fee of $50.00.
GC Bidding
$1,000,000.00
Public - City
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 12, 2026
September 26, 2026
To Be Determined, Aurora, MN
Related To This Project
Aurora, MN
Bid Date: Jul 01 2026
Aurora, MN
Bid Date: Sep 04 2026
Aurora, MN
--
Aurora, MN
Bid Date: Aug 29 2025
Aurora, MN
Bid Date: May 09 2025
Aurora, MN
Bid Date: Apr 07 2025
Aurora, MN
Bid Date: Feb 20 2025
Aurora, MN
Bid Date: Apr 29 2025
Aurora, MN
Bid Date: Jan 29 2025
Aurora, MN
Bid Date: Dec 13 2024
Aurora, MN
Bid Date: Dec 16 2024
Aurora, MN
Bid Date: Aug 28 2024
Aurora, MN
Bid Date: Apr 22 2024
Aurora, MN
Bid Date: Feb 15 2024
Aurora, MN
Bid Date: Apr 16 2024
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
