Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published August 24, 2026 at 8:00 PM
Updated August 26, 2026
Demolition, site work, new construction and renovation of a golf course in Aurora, Minnesota. Completed plans call for the construction of a golf course; for the renovation of a golf course; for the demolition of a golf course; and for site work for a golf course.
Golf course green construction, bunker construction, irrigation system installation and upgrades, grading, clearing, drainage installation, cart path replacement, and turf establishment. 6484 Wynn Creek Drive Biwabik, MN 55708 The work will be done under one prime contract that includes golf course green construction, bunker construction, irrigation and grassing. The project includes all labor and materials as required to complete the work as outlined in the plans and specifications. The Contractor shall be responsible for the total Work of this component included within the specifications and drawings as prepared by the Golf Course Designer. The Contractor shall be responsible for the scheduling and general management of the work of the Project and for the acts and omissions of all their employees; all subcontractors, their agents and employees; and all other persons performing any of the Work under a subcontract with the Contractor. The Contractors shall supervise and direct the Work, using their best skills and attention. They shall be solely responsible for all construction means, methods, techniques and procedures and for coordinating all portions of the Work under the Contract. The Contractors shall be responsible for initiating, maintaining and supervising all safety precautions and programs in connection with the Work. The following summary is a general guide to the scope of work. It should not be construed as a detailed list of work included in the contract. 1. Mobilization, Permits, Install proposed SWPPP 2. Clear undergrowth Trees, Cut Stumps to grade 3. Spray Herbicides (by Owner, unless Alternate 8 Accepted) 4. Scalp, Verti-cut and Aerify Existing Turf (by Owner, unless Alternate 9 Accepted) 5. Strip Turf and Topsoil in Areas to be graded , stockpile 6. Core Existing Sand/Mix from Sand Bunkers, Tees and Greens 7. Demo and Dispose of Cart Paths, Replace with new Cart Paths (where shown) 8. Mass Grading and Shaping of indicated areas (partial) 9. Replace and Install New Drain Pipes 10. Expand 10 Greens to original dimensions 11. Build 10 new green complexes, complete 12. Build, Level and Install new mix on all main tee complexes, Build 16 New forward tees, 1 new back tee on hole 18 (and others, if alternate bids are accepted) 13. Install complete new irrigation and upgrade pump station 14. Remove sand, rebuild and/or remove sand bunkers as shown on plans, install new sand 15. Prep soil , fertilize, amend , and grass (sod or seed as shown on plans) 16. Project Manuals, Record Drawings, Closeout to Final Completion Question Deadline 08/24/2026 at 12:00 PM CT
Sub-Bidding
$10,438,500.00
Public - State/Provincial
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 4, 2026
November 3, 2026
6484 Wynne Creek Dr, Aurora, MN
Related To This Project
Aurora, MN
Bid Date: Aug 18 2026
Aurora, MN
Bid Date: Jul 01 2026
Aurora, MN
--
Aurora, MN
Bid Date: Aug 29 2025
Aurora, MN
Bid Date: May 09 2025
Aurora, MN
Bid Date: Apr 07 2025
Aurora, MN
Bid Date: Feb 20 2025
Aurora, MN
Bid Date: Apr 29 2025
Aurora, MN
Bid Date: Jan 29 2025
Aurora, MN
Bid Date: Dec 13 2024
Aurora, MN
Bid Date: Dec 16 2024
Aurora, MN
Bid Date: Aug 28 2024
Aurora, MN
Bid Date: Apr 22 2024
Aurora, MN
Bid Date: Feb 15 2024
Aurora, MN
Bid Date: Apr 16 2024
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
