BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published September 4, 2026 at 8:00 PM

Updated September 9, 2026

Renovation of an educational facility in Huffman, Texas. Completed plans call for the renovation of a 12,000-square-foot educational facility.

SECTION 1-INTRODUCTION AND PROJECT OVERVIEW1.1 About Huffman ISD Huffman Independent School District is a public school district located in Harris County, Texas, servingthe communities of Huffman, Highlands, and surrounding areas. The District is governed by a Board ofTrustees and operates under the authority of the Texas Education Agency (TEA).1.2 Project Background Huffman ISD is issuing this Request for Competitive Sealed Proposals (RFCSP) to solicit proposalsfrom qualified general contractors for the construction of two related but separately funded projects. Wewill separate them by Component 1 and Component 2. Construction Locations: - Operations Center: 25744 Willy Ln, Huffman, TX 77336- Huffman Elementary School: 24403 E Lake Houston Pkwy, Huffman, TX 7733 Question Cuttoff Date & Time 8/27/2026 03:00:00 PM (ET) pn-225112.00 The Work of Project is defined by the Contract Documents and consists of, but may not necessarily be limited to, the following: a. Interior refresh of (approximately 12,000 SQFT) select existing classrooms, corridors and restrooms to a existing building occupancy type (E) education. Construction type II-B. Work includes architectural finishes, doors and replacement of existing mechanical, electrical and plumbing one for one as required to update the select areas for maintenance to various buildings occupancy (E) education throughout the Huffman Elementary School campus. Exterior lighting improvements to existing exterior canopies. Refer to Drawings and Specifications for additional details Component 1 - New Operations Center - Building A, C, D, E and F (details below) The selected Contractor shall provide all labor, materials, equipment, and supervision required for the complete construction of a new Operations Center Campus in accordance with the Contract Documents. All work to comply with FEMA PA Category E procurement and documentation requirements. The general scope includes the following and is described specifically in Construction Documents at https://huffmanisd.ionwave.net. FEMA's Record of Environmental Consideration is also included as Attachment B. Building A: Maintenance Center: One Story Bus Maintenance Facility Building C: Transportation Center: One Story Shops and Warehouse Building Building D: Machinery and Equipment Canopy Building E: Fuel Station Canopy Building F: Bus Wash Canopy Bus Parking Lot Operations Center Main Parking Lot Driveway and Fire Lanes The Component 1 scope shall be maintained separately from Component 2 scope in all cost proposals, scheduling, invoicing, and project documentation. Federal funding requirements apply to Component 1 . Although a single contract will govern both Components, all billing, change orders, and cost records must clearly identify and separate costs by Component. A procurement kick-off meeting will be scheduled with the awarded contractor. 4.3 Component 2 - Huffman Elementary School Upgrades & Building B (details below) The selected Contractor shall provide all labor, materials, equipment, and supervision required to complete the Upgrades to HES and the construction of Building B (within the operations center campus) in accordance with the Contract Documents. The general scope includes the following and is described specifically in Construction Documents at https://huffmanisd.ionwave.net: o Huffman Elementary School Upgrades: MEP Upgrades Interior Renovations Security Upgrades Operations Center Building B Operations Center Central Plant and Related Utilities Potential Alternates (if selected and approved) 1 - Parking Lot Lighting at HES 2- Mini Split Units in 9 IDF Rooms at HES 3- Operations Center Parking Lot (20 spots) The Component 2 scope shall be maintained separate from Component 1 scope in all cost proposals, scheduling, invoicing, and project documentation. No federal funding requirements apply to Component 2. Although a single contract will govern both Components, all billing, change orders, and cost records must clearly identify and separate costs by Component.

GC Bidding

$6,200,000.00

Public - City

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
437
Active Projects
193
Bidding Soon
3,763
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 10, 2026

October 1, 2026

Project location map

Multiple Locations, Huffman, TX


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.