Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published July 30, 2026 at 8:00 PM
Updated August 5, 2026
Site work and paving for a mixed-use development in Elkhart Lake, Wisconsin. Conceptual plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.
C Plymouth, Milwaukee Street Extend service life of pavement and curb ramp improvements. 4530-13-00 Perpetuation project to resurface approximately 0.65 miles of STH 67 from CTH PP to Riverbend Drive in the Town of Plymouth and the City of Plymouth in Sheboygan County. 4530-13-01 Standalone Curb Ramp Program (SCRIP) project to address curb ramps along 5.44 miles of STH 67 from Riverbend Drive to Suhrke Road in the city of Plymouth, Sheboygan County. 4550-08-00 Perpetuation project to resurface approximately 0.49 miles of STH 67 from Riverbend Drive to Mill Street in the City of Plymouth in Sheboygan County. Approximately 25 curb ramps will be evaluated and those that are identified as being out of compliance will be investigated and reconstructed to standard or documented as technically infeasible. Spot repairs to curb and gutter. Anticipated Construction Cost: $2,000,000-$2,999,999 The Method of Contractor Selection Has Not Been Determined at This Time. WI DOT - RFP Engineering - Perpetuation - Resurfacing *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Conceptual
$2,999,999.00
Public - State/Provincial
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 21, 2026
WI-67, Elkhart Lake, WI
Related To This Project
Elkhart Lake, WI
Bid Date: May 15 2026
Elkhart Lake, WI
Bid Date: Mar 18 2026
Elkhart Lake, WI
Bid Date: Dec 04 2025
Elkhart Lake, WI
Bid Date: Dec 16 2025
Elkhart Lake, WI
Bid Date: Dec 11 2025
Elkhart Lake, WI
Bid Date: Nov 06 2025
Elkhart Lake, WI
Bid Date: Oct 28 2025
Elkhart Lake, WI
Bid Date: Oct 07 2025
Elkhart Lake, WI
Bid Date: Aug 15 2025
Elkhart Lake, WI
Bid Date: Aug 27 2025
Elkhart Lake, WI
Bid Date: Feb 20 2025
Elkhart Lake, WI
Bid Date: Nov 15 2024
Elkhart Lake, WI
Bid Date: Jul 12 2024
Elkhart Lake, WI
Bid Date: Aug 28 2019
Elkhart Lake, WI
Bid Date: Nov 17 2023
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
