Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published October 5, 2026 at 8:00 PM

Updated October 7, 2026

Site work and renovation of a water / sewer project in Bloomingdale, New Jersey. Working plans call for the renovation of a water / sewer project.

As of October 05, 2026, bid was rejected. No definite date for the rebid. The Bloomingdale Interceptor lining project will include utilizing Spiral Wound PVC to line approximately 7,300 linear feet of gravity sewer line of varying size and material. See project drawings and specifications. Bonds: 10% Bid Bond, Certified Check required, Performance Bond required (unspecified amount), Payment Bond required (unspecified amount), Maintenance Bond required (unspecified amount). Question Deadline 08/27/2026 All questions about the meaning or intent of the Bidding Documents are to be submitted to Engineer in writing. The Contractor shall furnish all labor, materials, and construction equipment, and purchase, deliver, off-load, install, and test the various work required by the Contract Documents. The work includes, but is not necessarily limited to the following: 1. Hydraulic Cleaning of gravity sewer lines, where indicated, to allow for accurate CCTV Inspection. Contractor disposal of all material removed from the gravity sewers. Sewer lines were last cleaned in 2023. 2. CCTV Inspection and documentation of gravity sewers. 3. Machine Spiral Wound PVC lining of gravity sewers, including any modifications to the existing manholes necessary to accommodate the lining equipment. 4. Traffic Control measures, as required. Conformance with all required permits. 5. Final Cleanup, restoration and repair of any damage. The work to be performed under this Contract consists of furnishing of plant, equipment, superintendence, labor, skills, and all other items necessary to perform Normal Cleaning, CCTV inspection, and Spiral Wound Lining of gravity sewers, as detailed or required in the Contract Documents.

Final Planning

$500,000.00

Public - City

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
1,224
Active Projects
511
Bidding Soon
7,550
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 1, 2026

April 5, 2027

Project location map

Hamburg Turnpike, Bloomingdale, NJ

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed