Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published August 26, 2026 at 8:00 PM
Updated September 1, 2026
Site work and renovation of a medical facility in Carrabelle, Florida. Completed plans call for the renovation of a medical facility.
Pharmacy construction at the Weems Medical Center East facility. George E. Weems Memorial Hospital is establishing a retail community pharmacy at Weems Medical Center East, 110 NE 5th Street, Carrabelle, Florida 32322, to restore local pharmacy access that has been absent for nearly a decade. The pharmacy will serve the full community (not limited to Weems patients), participate in the federal 340B Drug Pricing Program, and is expected to improve medication access and health outcomes in eastern Franklin County. Bonds: 100% Performance Bond, 100% Payment Bond, 5% Bid Bond, Certified Check required. Question Deadline 09/28/2026 at 5:00 PM ET For questions related to the Contract Documents or to register as a plan holder, contact Weems Memorial Hospital Facilities / Materials Management at (850) 653-8853. , Attn: Craig Gibson. The Work under this solicitation is anticipated to consist primarily of an interior build-out / fit-out of existing space within or adjacent to the medical center, including but not limited to: Demolition and selective removal as required for the new layout; New partitions, doors, hardware, and finishes suitable for a retail pharmacy and medication storage; Pharmacy-specific cabinetry, counters, shelving, and secure storage (including controlledsubstance security as required by the Florida Board of Pharmacy and DEA if applicable); Electrical, data, and low-voltage work for lighting, power, point-of-sale, security cameras, access control, and pharmacy systems; HVAC modifications or balancing as needed for the occupancy and any temperature/humiditysensitive storage; Plumbing for sinks or other fixtures as required; Fire protection, fire alarm, and life-safety adjustments coordinated with the Authority Having Jurisdiction and Weems Life Safety; Signage (interior and limited exterior as permitted); Final cleaning, commissioning support, and close-out documentation. The overall project timeline from approval (April 2026) to operational pharmacy is estimated at nine to twelve months, encompassing regulatory approvals, build-out, staffing, and stocking. Capital costs for the build-out are estimated in the range of approximately $ 114,000 (subject to final design and bidding). The successful contractor will be expected to coordinate closely with Weems Facilities to minimize disruption to ongoing primary-care operations at the medical center
GC Bidding
$114,000.00
Public - County
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 5, 2026
November 4, 2026
110 5th St E, Carrabelle, FL
Related To This Project
Carrabelle, FL
Bid Date: Aug 26 2026
Carrabelle, FL
Bid Date: Jul 09 2026
Carrabelle, FL
Bid Date: May 01 2026
Carrabelle, FL
Bid Date: May 14 2026
Carrabelle, FL
--
Carrabelle, FL
Bid Date: Jun 01 2026
Carrabelle, FL
Bid Date: Feb 05 2026
Carrabelle, FL
Bid Date: Dec 01 2025
Carrabelle, FL
Bid Date: Aug 01 2025
Carrabelle, FL
Bid Date: Aug 06 2025
Carrabelle, FL
Bid Date: Oct 10 2025
Carrabelle, FL
Bid Date: Apr 08 2026
Carrabelle, FL
Bid Date: Jun 03 2025
Carrabelle, FL
Bid Date: May 02 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
