Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published October 23, 2026 at 8:00 PM

Updated October 26, 2026

Site work for a road / highway in Guilford, Vermont. Completed plans call for site work for a road / highway.

As of October 23, 2026, this project has not yet been awarded. A timeline for the award has not yet been established. Ditching, installing stone turnouts, replacing culverts, hydroseeding, road grading, traffic control, and tree removal. Submit this completed form to VTrans Grants in Aid at grantsinaid@vermont.gov. Call Coordinator Elise Grout (802)793-0529 or Ashley Andrews (802)498-5548 with any questions. The Town of Guilford requests sealed bids for a Ditching Repair project on one segment of Carpenter Hill Road . Locations indicated on the attached map. Additional Segment: Barney Hill Road from Carpenter Hill Road to the Clark Farm, approximately 1000 feet as instructed by Highway Foreman, Jim Freeman. Work to be performed under this project includes but is not limited to ditching, installing stone turnouts, replacing culverts, hydroseeding, road grading and traffic control. 1) Install grass lined ditch in accordance with attached guideline. 2) Install stone lined ditch in accordance with attached guideline using 6"-12" ditch stone. 3) Regrade roadway in accordance with attached guideline to correct the road crown and to eliminate berms. 4) Replace culverts, construct swales, berms and ditches as needed. 5) Tree removal as directed by Jim Freeman, Highway Foreman.

Post-Bid

$450,000.00

Public - City

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
575
Active Projects
249
Bidding Soon
3,867
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 14, 2026

September 21, 2026

Project location map

Carpenter Hill Rd, Guilford, VT

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed