BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published August 20, 2026 at 8:00 PM

Updated August 24, 2026

Site work for a road / highway in Guilford, Vermont. Completed plans call for site work for a road / highway.

Ditching, installing stone turnouts, replacing culverts, hydroseeding, road grading, traffic control, and tree removal. Submit this completed form to VTrans Grants in Aid at grantsinaid@vermont.gov. Call Coordinator Elise Grout (802)793-0529 or Ashley Andrews (802)498-5548 with any questions. The Town of Guilford requests sealed bids for a Ditching Repair project on one segment of Carpenter Hill Road . Locations indicated on the attached map. Additional Segment: Barney Hill Road from Carpenter Hill Road to the Clark Farm, approximately 1000 feet as instructed by Highway Foreman, Jim Freeman. Work to be performed under this project includes but is not limited to ditching, installing stone turnouts, replacing culverts, hydroseeding, road grading and traffic control. 1) Install grass lined ditch in accordance with attached guideline. 2) Install stone lined ditch in accordance with attached guideline using 6"-12" ditch stone. 3) Regrade roadway in accordance with attached guideline to correct the road crown and to eliminate berms. 4) Replace culverts, construct swales, berms and ditches as needed. 5) Tree removal as directed by Jim Freeman, Highway Foreman.

GC Bidding

$450,000.00

Public - City

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
619
Active Projects
298
Bidding Soon
3,927
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 14, 2026

September 21, 2026

Project location map

Carpenter Hill Rd, Guilford, VT

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.