BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published September 23, 2026 at 8:00 PM

Updated September 27, 2026

Renovation of a military facility in Eielson AFB, Alaska. Working plans call for the renovation of a military facility.

Replace two fire pump controllers (FPCs), decommission and remove one legacy foam-releasing control panel, and install a new control panel for the preaction/wet fire protection system. Decommission and remove one High-Expansion Foam (HEF) tank and concentrate storage system. The existing HEF system is currently locked out from operation and must be removed and disposed of properly. Refer to the Scope of Work and supporting documents for the complete requirement description. The estimated order of magnitude for the project is between $350,000 and $500,000. The objective of this project is to replace two (2) fire pump controllers (FPCs), decommission and remove one ( 1) legacy foam-releasing control panel and install a new panel for the preaction/wet system. Decommission and remove one ( 1) High-Expansion Foam (HEF) tank and concentrate storage system. The existing HEF system is locked out from operation and must be removed and disposed of properly. For the foam-releasing control panel the contract must perform a pre-installation site survey to audit all existing field devices and size the new panel to support those devices. Most of the work is in Bldg. 1176 Mechanical/Utility Room (Room # 123 ). Additionally, the contractor must remove and terminate six (6) manual foam-releasing pull stations inside Hangar Bay of Bldg. 1176 Please forward all questions to 168th Mission Support Contracting Office no later than 10 September 2026, 12:00PM Alaska Standard Time. An amendment may be issued to answer all questions received, providing Government's responses. Capt Daniel Pankratz and SMSgt Cheyenne Youngbird at the following addresses: daniel.pankratz.3@us.af.mil and cheyenne.youngbird.1@us.af.mil . *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Final Planning

$500,000.00

Public - Federal

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
11
Active Projects
2
Bidding Soon
41
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 28, 2026

March 23, 2027

Project location map

To Be Determined, Eielson AFB, AK

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.