Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Create your *free account*
Fill in a few details to keep viewing projects.
You've used your *free project views*
Register today to keep viewing commercial construction projects bidding in your area.
With ConstructConnect Project Intelligence, you can:
- Filter 825,000+ active commercial projects down to the ones that fit your trade and area
- Reach the right people with contact info for 575,000+ construction companies
- See who's bidding before you put in the hours
- Get daily email updates and alerts on the projects you're watching
Published October 1, 2026 at 8:00 PM
Updated October 7, 2026
Renovation of a medical facility in Cherokee, Iowa. Completed plans call for the renovation of a four-story above grade medical facility.
The Iowa Department of Administrative Services will be receiving bids for replacement of Elevator F, a 4 stop, hydraulic elevator in the Main Building, referred to as the Four Corner area at the Cherokee Mental Health Complex in Cherokee, IA. Question Deadline 09/15/2026 at 2:00 PM CT Questions must be submitted to the Issuing Officer. For further information regarding this project contact: Katelyn Howells - Issuing Officer Phone: 515-721-7856 E-Mail: construction.procurement@iowa.gov Scope Applicable to All Bid Packages: The Contractor's Work includes all labor, supervision , materials, equipment, services, supplies, tools, facilities, transportation, hoisting, storage, receiving, licenses, inspections, certifications, overhead, profit, or other items required or reasonably inferable to properly and timely perform and complete all work and services to be performed by the Contractor pursuant to this Agreement. Unless specifically stated otherwise, incidental work required to accomplish the work of this Bid Package shall be included the bid. This would include, but not be limited to, temporary facilities, protection of the work, security of equipment, materials, and work in progress, etc. Contractor's Work shall be performed in accordance with the Drawings, Specification Divisions 00 and 01 , and Specification sections applicable to each Contractor's scope. Contractor is responsible for all labor and equipment to unload, account for all material delivered, stock, and delivery for this scope of work. Storage and delivery of materials and equipment at the Site shall be permitted only to the extent approved in advance by the Construction Manager, and if anything so stored obstructs the progress of any portion of the work, it shall be promptly removed or relocated by the Contractor without reimbursement. On site supervision by Prime Contractor at all times work by that contractor or their subcontractors/suppliers is taking place. Provide all temporary facilities required for this scope of work including trailer, trailer power, telephone, secured storage, temporary power for work, temporary and task lighting for work, etc. as determined necessary by Contractor. Coordinate location of trailers, material storage and utility lines with Construction Manager. Limited space is available, and permission to bring any such facility or excess materials on to the site shall be approved by the Construction Manager. Contractor shall provide all equipment and tools for Contractor's own cleanup. Clean up shall be done at end of every shift or more frequently if required for the Contractor to perform their work, for other Contractors to perform their work, as required by the Owner's operations, and at the discretion of the Construction Manager. All turf, landscaping, and subgrade disturbances caused by equipment traffic or other activities related to the Contractor's scope shall be repaired or restored to proper conditions by the Contractor. Protect adjacent existing building elements from damage from Scope of work. Repair existing building elements damaged during Contractor's Scope of work. 8. 01 1201 General Work Requirements are the responsibility of all contractors 9. 01 1202 Special Work Requirements are the responsibility of all contractors
Post-Bid
$10,000,000.00
Public - State/Provincial
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 29, 2026
October 13, 2026
1251 W Cedar Loop, Cherokee, IA
Related To This Project
Cherokee, IA
Bid Date: Sep 30 2026
Cherokee, IA
Bid Date: Aug 14 2026
Cherokee, IA
Bid Date: Aug 13 2026
Cherokee, IA
Bid Date: Aug 21 2026
Cherokee, IA
Bid Date: Aug 04 2026
Cherokee, IA
--
Cherokee, IA
Bid Date: Jul 21 2026
Cherokee, IA
Bid Date: Jun 11 2026
Cherokee, IA
Bid Date: Jun 24 2026
Cherokee, IA
Bid Date: Apr 14 2026
Cherokee, IA
Bid Date: Apr 16 2026
Cherokee, IA
Bid Date: Jan 13 2026
Cherokee, IA
Bid Date: Jan 13 2026
Cherokee, IA
Bid Date: Dec 16 2025
Unlock the Full Project List
Access every active project near you — get started today.
- 825,000+ active commercial projects tracked daily
- Verified contact info for the GC, owner, and architect
- New leads delivered to your inbox every morning
Create your account to get started.
Takes less than a minute — no credit card needed