Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published September 29, 2026 at 8:00 PM

Updated October 6, 2026

Site work for a water / sewer project in Boxborough, Massachusetts. Completed plans call for site work for a water / sewer project.

Underground Fuel Storage Tank Removal Project. The work consists of removal and proper disposal of two existing 4,000-gallon underground diesel fuel storage tanks and associated piping at the Boxborough Department of Public Works Annex, including excavation, environmental testing coordination, backfilling, site restoration, disposal, and required regulatory documentation. Key Scope Items: Removal and legal off-site disposal of two 4,000-gallon diesel USTs and piping. Concrete/asphalt removal, tank cleaning, and liquid/sludge disposal. Environmental testing coordination with the Town-designated Licensed Site Professional (LSP). Backfilling (12-inch lifts), compaction, and final soil grading (asphalt replacement excluded). Complete closeout submittals, tank yard receipts, and waste manifests. Bids are being solicited pursuant to M.G.L. c. 30, 39M Question Deadline 09/17/2026 For Bid Related Questions: Town Administrator's Office townadmin@boxborough-ma.gov (978) 264-1718 For Technical Questions Ed Kukkula, DPW Director ekukkula@boxborough-ma.gov (978) 264-1792

Bid Results

$26,950.00

Public - City

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
838
Active Projects
364
Bidding Soon
5,823
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 24, 2026

October 26, 2026

Project location map

577 Massachusetts Ave, Boxborough, MA

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed