BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published September 21, 2026 at 8:00 PM

Updated September 27, 2026

Site work and new construction of a municipal facility in Export, Pennsylvania. Completed plans call for the construction of a municipal facility.

Any questions regarding the project must be submitted to Allen Kniss no later than 4:00 P.M. on September 25, 2026, via email at allen.kniss@gibsonthomas.com Installation of a new helicopter pad. Bonds: 10% Bid Bond, Certified Check required. Scope Work The Work to be done under the Contract, as shown on the Plans and Specifications, shall include the furnishing and complete installation of all Materials and any other necessary Work required for proper completion, operation and use of the facilities. All the equipment, Materials and labor that may be necessary to complete the Work and place it in satisfactory operation , implied or intended in the Plans and Specifications, shall be furnished and/or installed by Contractor without extra cost to the Owner. The titles or headings of the various divisions, sections, paragraphs, subparagraphs or of Shop Drawings, and the Table of Contents and the indexes, as used in any of the Contract Documents are for convenience of reference only and are not intended to limit and shall not be construed as in any way limiting the application of the text.

Sub-Bidding

$900,000.00

Public - City

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
347
Active Projects
160
Bidding Soon
2,349
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 1, 2026

November 2, 2026

Project location map

Kennedy Ave. abutting Jones Farm Court roadway, Export, PA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.