Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published October 27, 2026 at 8:00 PM

Updated November 3, 2026

Site work and paving for a mixed-use development in Abington, Massachusetts. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

Central Street Water Main Improvements Project - The base bid scope of work includes construction of approximately 1,850 linear feet of new 8-inch ductile iron water main along Central Street from Washington Street to Plymouth Street. The project shall include the installation of hydrants, valves, fittings and other appurtenances, as well replacing water services from the new main to the curb stop. The project also includes a Bid Alternate A for curb to curb paving and Bid Alternate B for an additional 375 linear feet of water main work partially located in the zone of influence of an MBTA railroad over pass. Contractor Qualification DCAMM Certificate Required for DCAMM contracts over $150,000, Highway Division contracts over $50,000. Question Deadline 10/14/2026 Every request for such interpretation should be in writing (typed, not handwritten) addressed to Weston & Sampson Engineers, Inc., 55 Walkers Brook Drive, Reading, Massachusetts 01867 Attention: CSD, or sent via email to Selfridge.Genny@wseinc.com and to be given consideration must be received at least ten working days prior to the date fixed for the opening of bids.

Post-Bid

$700,000.00

Public - City

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
680
Active Projects
325
Bidding Soon
4,491
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 28, 2026

November 27, 2026

Project location map

Central St, Abington, MA

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed