Black Friday through Cyber Monday: Get 10% off Project Intelligence

See pricing

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published November 24, 2026 at 7:00 PM

Updated November 28, 2026

Demolition, site work, paving and new construction of a mixed-use development in Everson, Washington. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; for paving for a bridge / tunnel; sidewalk / parking lot; sidewalk / parking lot; road / highway; road / highway; and water / sewer project.

Requires relocating buried utilities, removing the existing 135-foot long arch culvert No. 544/9c, construct a new bridge south of the existing Nooksack River Bridge No. 544/10, perform partial replacement of the existing Nooksack River Bridge No. 544/10 south approach slab adjacent sidewalk and traffic barrier to accommodate and install a roadway bypass, install new utilities and drainage, construct scour countermeasures, and restore the area with landscaping, traffic control and other work. Involves 145 items and 300 working days. Work class 6, bridges and structures. Estimated value : $14,000,000 - $15,000,000 WA DOT - SR 544, Nooksack River Overflow Culvert ER Permanent Repair *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

GC Bidding

$15,000,000.00

Public - State/Provincial

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
274
Active Projects
71
Bidding Soon
2,135
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 9, 2026

February 8, 2027

Project location map

WA-544, Everson, WA

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed