Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published October 19, 2026 at 8:00 PM

Updated October 24, 2026

Site work and environmental remediation for a mixed-use development in Burbank, Washington. Conceptual plans call for environmental remediation for a development; and playground / park / athletic field.

Request for Clarification Deadline: October 14, 2026 COB Response to Clarification Deadline: October 23, 2026 COB Development of final construction-ready designs for floodplain reconnection and in-stream fish and wildlife habitat enhancement. Scope includes hydrologic and hydraulic assessments, channel modification, floodplain and wetland excavation, creation of side/off-channel features, installation of habitat structures, riparian and upland planting, invasive plant removal, and site access improvements.

Conceptual

$450,000.00

Public - Federal

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
56
Active Projects
22
Bidding Soon
480
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 30, 2026

Project location map

64 Maple St, Burbank, WA

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed