Find the next project before your competition does.

See pricing

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published November 3, 2026 at 7:00 PM

Updated November 8, 2026

Site work for a water / sewer project in Chesterton, Indiana. Working plans call for site work for a water / sewer project.

Cancellation Description This Pre-Solicitation Notice is being issued by the United States Army Corps of Engineers - Chicago District to inform interested contractors of the District intent to issue a solicitation for the Section 219 Chesterton Interceptor Rehab, Chesterton, Indiana.****PROJECT INFORMATION: Under the contract, the contractor will be required to provide the following construction services: the construction work includes relining approximately 3,217 linear feet of an existing 48-inch trunk sewer with a 42-inch slipliner pipe (comprising approximately 2,368 linear feet of Base Work and 849 linear feet of Option Work). The work involves specialized insertion pits (using two insertion pits), sewer cleaning, televising, proofing, sliplining, annulus grouting, sewer lateral reinstatement, maintenance of traffic, and temporary erosion and sediment control. Contracted personnel must be trained, certified, and equipped for all safety operations in accordance with (IAW) U.S. Army Corps of Engineers EM 385-1-1 standards.The Chesterton Interceptor is located along 8th Street, spanning from 8th Street and Morgan Avenue to the wastewater treatment plant on League Lane in Chesterton, Indiana.****CONTRACTING OFFICE: USACE Chicago District, 231 South LaSalle Street, Suite 1500, Chicago IL 60604****ACQUISITION INFORMATION: Competition for this acquisition is RESERVED EXCLUSIVELY for Small Business Concerns (100% Small Business Set-Aside). The North American Industry Classification System (NAICS) Code is 237990 (Other Heavy and Civil Engineering Construction), with an SBA small business size standard of $45.0 Million. The magnitude of cost for construction is estimated between $1,000,000.00 and $5,000,000.00. The solicitation package (RFP) is planned for advertisement in November 2026.The solicitation will be downloadable from the internet only via the Procurement Integrated Enterprise Environment (PIEE). The project specification and drawing files are PDF files and can be viewed, navigated, or printed using Adobe Acrobat Reader. Once the package is released into advertisement, interested offerors may download the full solicitation package.****IMPORTANT POLICY: Contractors are REQUIRED to be registered in the System for Award Management (SAM) AT THE TIME ITS BID/PROPOSAL IS SUBMITTED to comply with the annual representations and certifications requirements. Registration can be completed free of charge at www.sam.gov. Contractors must register with sam.gov, prior to registering with the DoD Procurement Integrated Enterprise Environment (PIEE) system. Your firm must register with PIEE in order to access the solicitation and to place a bid/proposal in response to the upcoming USACE Solicitation. Use the PIEE System Registration link: https://piee.eb.mil, and follow the instructions on their website. Request for Solicitation packages made by telephone, fax, or e-mail will not be honored. ****The Point of Contract for this acquisition is Jim Parizek at James.P.Parizek@usace.army.mil.****Please include Solicitation number W912P627RA003 on all correspondence. The construction work includes relining approximately 3,217 linear feet of an existing 48-inch trunk sewer with a 42-inch slipliner pipe (comprising approximately 2,368 linear feet of Base Work and 849 linear feet of Option Work). The work involves specialized insertion pits (using two insertion pits), sewer cleaning, televising, proofing, sliplining, annulus grouting, sewer lateral reinstatement, maintenance of traffic, and temporary erosion and sediment control. Contracted personnel must be trained, certified, and equipped for all safety operations in accordance with (IAW) U.S. Army Corps of Engineers EM 385-1-1 standards. The magnitude of cost for construction is estimated between $1,000,000.00 and $5,000,000.00 . Total Small Business Set-Aside (FAR 19.5) *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. The method of Contractor Selection has not been Determined at this time.

Final Planning

$5,000,000.00

Public - Federal

Our team is requesting plans for this project.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
545
Active Projects
202
Bidding Soon
3,808
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 3, 2027

Project location map

W Morgan Ave & S 8th St, Chesterton, IN


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed