Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Create your *free account*
Fill in a few details to keep viewing projects.
You've used your *free project views*
Register today to keep viewing commercial construction projects bidding in your area.
With ConstructConnect Project Intelligence, you can:
- Filter 825,000+ active commercial projects down to the ones that fit your trade and area
- Reach the right people with contact info for 575,000+ construction companies
- See who's bidding before you put in the hours
- Get daily email updates and alerts on the projects you're watching
Published November 20, 2026 at 7:00 PM
Updated November 23, 2026
Site work and paving for a civil project in Hillsboro, North Dakota. Completed plans call for site work for a road / highway; for paving for a road / highway; bridge / tunnel; bridge / tunnel; and water / sewer project.
Proposed Work Consists of 9.6170 Miles of Grading, Ditch Cleaning, Pcc Pavement, Mill & Hma Overlay, Slope Protection, Structure Repairs, Bridge Deck & Approach Slab Replacements, Culverts, Fencing, & Guardrail Located I-29, 2.5 Mi S of Hillsboro N to Near Jct Nd 200 - Sb and Involves Approximately: 1 L Sum Contract Bond; 1 L Sum Railway Protection Insurance; 1 L Sum Railroad Coordination; 1500 Day Railroad Flagging; 1 L Sum E-ticketing; 1 L Sum Clearing & Grubbing; 11 Ea Removal of Trees 10in; 4 Ea Removal of Trees 18in; 6212 Ton Remove Aggregate BASE & Surfacing; 2 Ea Removal of Concrete; 1 L Sum Removal of Structure; 1 L Sum Removal of Concrete; 179304 Ton Removal of Pavement; 1 Ea Removal of End Section-all Types & Sizes; 3476 Lf Removal of Culverts-all Types & Sizes; 50206 Lf Remove Existing Fence; 6 Ea Removal of Temporary Bypass; 22019 Cy Common Excavation-type a; 51568 Cy Topsoil; 51469 Cy Common Excavation-waste; 2806 Cy Common Excavation-subcut; 2181 Cy Borrow-excavation; 2288 Cy Subcut Aggregate; 1 Ea Box Culvert Excavation; 2900 Cy Foundation Fill; 1 Ea Foundation Preparation-box Culvert; 3213 M Gal Water; 1 L Sum Prepare Stockpile Site; 1 L Sum Restore Stockpile Site; 124.7 Acre Seeding Class Ii; 123.7 Acre Temporary Cover Crop; 248.4 Acre Soil Stabilization; 797 Sy Ecb Type 2; 312 Sy Trm Type 1; 92765 Lf Silt Fence Unsupported; 92765 Lf Remove Silt Fence Unsupported; 102429 Lf Fiber Rolls 12in; 4174 Lf Remove Fiber Rolls 12in; 908 Lf Fiber Rolls 20in; 454 Lf Remove Fiber Rolls 20in; 583 Lf Flotation Silt Curtain; 583 Lf Remove Flotation Silt Curtain; 73224 Cy Salvaged BASE Course; 4704 Gal Tack Coat; 638 Ton Milling Pavement Surface; 11208 Ton Superpave FAA 43; 112 Ea Cored Sample; 100 Ton Patching; 722 Ton Pg 58s-28 Asphalt Cement; 173785 Sy 9in Nonreinf Concrete Pvmt Cl Ae-doweled; 80 Lf 3in Expansion Joint; 54 Sy Concrete Sleeper Slab; 32 Sy Pcc Pavement Grinding; 345.9 Cy Class Aae-3 Concrete; 50.5 Sy Concrete Bridge Approach Slab; 52.6 Sy Pile Supported Approach Slab; 180.4 Sy Bridge Approach Slab-remove & Replace; 1294 Sy Penetrating Water Repellent Treatment; 3 Ea Remove and Reset Anchor Bolts; 102 Lf 12ft X 15ft Precast Rcb Culvert; 1 Ea 12ft X 15ft Precast Rcb End Section; 1102 Lbs Reinforcing Steel-grade 60; 100477 Lbs Reinforcing Steel-grade 60-epoxy Coated; 1 L Sum Structural Steel; 534 Lf Remove & Reset Dbl Box Beam Retrofit - E-rail; 1 L Sum Mobilization; 2610 Mhr Flagging; 5834 Unit Traffic Control Signs; 1 Ea Lane Closure-signal Control/Flagging Control; 2 Ea Attenuation Device-type B-25; 1 Ea Attenuation Device-type B-40; 4 Ea Attenuation Device-type B-80; 36 Ea Type Iii Barricade; 261 Ea Delineator Drums; 676 Ea Tubular Markers; 285 Ea Delineator; 610 Ea Flexible Delineators; 2 Ea Sequencing Arrow Panel-type C; 2 Ea Sequencing Arrow Panel-type C-crossover; 2 Ea Flashing Beacon; 6712 Sf Obliteration of Pavement Marking; 2570 Lf State Furnished Median Barrier; 2 Ea Vehicle Speed Feedback Sign; 1 Ea Field Office; 1 Ea Aggregate Laboratory; 1 Ea Bituminous Laboratory; 1 Ea Contractor's Laboratory; 277510 Sy Geosynthetic Material Type G; 3 Ea Temporary Bypass; 1 Ea End Sect-traversable Reinf. Conc.30in; 262 Lf Pipe Conduit 18in-approach; 100 Lf Pipe Conduit 24in; 80 Lf Pipe Conduit 24inapproach; 315 Lf Pipe Conduit 36in; 749 Lf Pipe Conduit 42in; 621 Lf Pipe Conduit Arch 51in X 31in; 24 Ea Right of Way Markers; 1 Ea Alignment Monuments; 14 Ea Iron PIN R/W Monuments; 18 Ea Iron PIN Reference Monuments; 400 Sy Sidewalk Concrete Reinf; 51154 Lf Fence Smooth Wire 3 Strand-steel Post; 5 Ea Fence Terminal; 4 Ea Vehicle Gate; 14 Ea Corner Assembly-steel Post; 30 Ea Double Brace Assembly-steel Post; 156 Sf Flat Sheet for Signs-type Xi Refl Sheeting; 42 Sf Flat Sheet for Signs-type Iv Refl Sheeting; 126 Ea Delineators-type a-single Sided; 38 Ea Delineators-type B; 18 Ea Delineators-type D; 222 Lf Galv Steel Poststandard Pipe; 475 Lf Galv Steel Posts-w-shape Posts(Two or More); 921 Sf Panel for Signs-type Iv Reflective Sheeting; 9 Ea Interstate Mile Posts-type C; 4 Ea Object Markers - Type I; 4 Ea Object Markers - Type Iii; 34 Ea Object Markers - Culverts; 5 Cy Class Ae Concrete-sign Foundations; 29 Ea Remove Sign Foundation; 18.26 Mile Sinusoidal Rumble Strip - Concrete Shoulder; 239310 Lf Epoxy Pvmt Mk 6in Line-grooved; 1780 Lf Epoxy Pvmt Mk 12in Line-grooved; 60 Lf Epoxy Pvmt Mk 24in Line-grooved; 22350 Ea Raised Pavement Markers; 1153 Lf Short Term 4in Line-type R; 6045 Lf Short Term 6in Line-type R; 143 Lf Short Term 24in Linetype R; 5870 Lf Short Term 6in Line-type Nr; 54136 Lf Pvmt Mk Painted 6in LINE; 988 Lf W-beam Guardrail; 5 Ea W-beam Guardrail End Terminal; 580 Lf Remove W-beam Guardrail & Posts; 7 Ea Remove End Treatment & Transition; 8 Ea Temporary Stream Diversion; 1 Set Bridge Bench Marks; 2 Ea Shoring; 73 Lf Silicone Sealant; 710 Sy Aggregate Slope Protection; 58 Sf Spall Repair; 1 L Sum Abutment Repair; 530 Lf Curb Overlay; 98 Lf Joint Treatment. *** End of Project 23103*** Bid Range $24,000,001 to $30,000,000 Prequalification is required for all bidders submitting a bidding proposal form. Prequalification is required annually. Prequalified contractors who wish to renew their prequalification must submit a complete "Contractor's Prequalification Statement" by July 1 of each calendar year. Bidders who are not currently prequalified must submit a complete "Contractor's Prequalification Statement" at least 10 business days prior to the date of the bid opening. Information is available from the Construction Services Division of the North Dakota Department of Transportation. Contractor's License--A contractor is not required to have a license from the state of North Dakota before bidding on any project, however, no contract will be awarded unless said contractor holds a current North Dakota license in the class within which the value of the contract falls. The right is reserved to reject any and all proposals, to waive technicalities, or to accept such as may be determined to be for the best interests of the state. NDDOT - 23103 - Grading, Ditch Cleaning, PCC Pavement, Mill & HMA Overlay *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Project No - SIM -8-029(111)066, SIM-8-029( 103)085, SIM-8-029 (084)104, SIM -8-029 (081)092, SIM -8-029 (080)085, HSP-8-999 ( 012 ), SIM-8-029(123)110 PCN - 15931, 15932, 15933, 15417, 18360
Post-Bid
$30,000,000.00
Public - State/Provincial
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
November 20, 2026
January 19, 2027
I-29, Hillsboro, ND
Related To This Project
Hillsboro, ND
Bid Date: Nov 03 2026
Hillsboro, ND
Bid Date: Nov 10 2026
Hillsboro, ND
Bid Date: Nov 03 2026
Hillsboro, ND
Bid Date: Apr 16 2026
Hillsboro, ND
Bid Date: Nov 25 2025
Hillsboro, ND
--
Hillsboro, ND
Bid Date: Dec 03 2025
Hillsboro, ND
Bid Date: Nov 25 2025
Hillsboro, ND
Bid Date: Nov 25 2025
Hillsboro, ND
Bid Date: Nov 25 2025
Hillsboro, ND
Bid Date: Nov 25 2025
Hillsboro, ND
Bid Date: Oct 28 2025
Hillsboro, ND
Bid Date: Sep 04 2025
Unlock the Full Project List
Access every active project near you — get started today.
- 825,000+ active commercial projects tracked daily
- Verified contact info for the GC, owner, and architect
- New leads delivered to your inbox every morning
Create your account to get started.
Takes less than a minute — no credit card needed