Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published November 14, 2026 at 7:00 PM

Updated November 16, 2026

Site work and new construction of a mixed-use development in Monroe, Wisconsin. Completed plans call for the construction of a bridge / tunnel; and playground / park / athletic field.

Construction of a new bridge over Round Grove Road on the Badger State Trail to replace a temporary at-grade crossing. Work includes installing a 130-foot bridge with concrete abutments, a 12-foot clear width, and structural capacity for vehicle and pedestrian loads. The scope also entails trail improvements consisting of 400 linear feet of regrading and surfacing, and raising the existing grade by approximately 5 feet to achieve 16.5 feet of vertical clearance. Bonds: 10% Bid Bond.

GC Bidding

$1,400,000.00

Public - State/Provincial

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
139
Active Projects
33
Bidding Soon
1,053
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 15, 2026

January 29, 2027

Project location map

Multiple Locations, Monroe, WI


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed