Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Create your *free account*
Fill in a few details to keep viewing projects.
You've used your *free project views*
Register today to keep viewing commercial construction projects bidding in your area.
With ConstructConnect Project Intelligence, you can:
- Filter 825,000+ active commercial projects down to the ones that fit your trade and area
- Reach the right people with contact info for 575,000+ construction companies
- See who's bidding before you put in the hours
- Get daily email updates and alerts on the projects you're watching
Published November 20, 2026 at 7:00 PM
Updated November 23, 2026
Site work for a bridge / tunnel in Holyoke, Colorado. Completed plans call for site work for a bridge / tunnel.
CMPs of any size (herein referred to as culverts) have been identified and prioritized by CDOT Staff. CDOT classifies culverts into three categories: non qualifying (less than 48-inches), minor culverts (48 inches or greater), and major structures (20-foot span or greater). This project will have an emphasis on non-qualifying culverts and some minor culverts. The project aims to rehabilitate the identified culverts by lining them with a Cured In Place Pipe (CIPP) treatment. The primary goals of the overall project include (1) adding design life to existing CMPs on state and federal roadways, (2) increasing the resiliency of CDOT infrastructure assets, and (3) utilizing remaining available funds from Phase 1 to repair and or replace as many CMPs as possible across Region 4. An in-house collaboration team from the Design Unit and Hydraulic Residency will develop preliminary and final design plans, specifications and estimates (PS&E) related to the repair and replacement of CMP culverts in Phase 2. Preliminary correlates to the Field Inspection Review (FIR) milestone in CDOT project delivery, and final design is the Final Office Review (FOR) milestone prior to advertisement. All PS&E will include culvert locations and information, culvert repair details and notes, culvert replacement design, initial construction scheduling, and construction phasing as applicable. The same in-house team will also be responsible for hydrologic and hydraulic analysis and design for the repair or replacement of culverts (mainly minor structures and others as directed by Resident Engineers). If needed, the in-house team will obtain any necessary No Rise certifications within regulatory floodplains, obtain floodplain development permits (FDPs) from local agencies, and develop a floodplain memorandum. A comprehensive hydraulic memo or summary matrix will be prepared that includes any culverts requiring a hydrologic or hydraulic analysis; separate reports will not be prepared. A stormwater management plan (SWMP) will be prepared as a template or a few templates similar to Phase 1, and as determined by the Region 4 Environmental team. The PE/PM will hold monthly progress meetings in addition to milestone meetings for the preliminary and final design review. A small team weekly meeting will also be hosted for the Hydraulics and Design team members. Project is in Region 4 in various counties. Project work consists of culvert rehabilitation at various locations. Please contact Brian Varrella at 970-373-6121 for all project related questions. Contract UDBE Goal: 0.00% CODOT - 009 - Region 4 - Culvert Rehabilitation
GC Bidding
$1,000,000.00
Public - State/Provincial
We’ve obtained documents for this project and are currently processing them.
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 10, 2026
January 11, 2027
Multiple Locations, Holyoke, CO
Related To This Project
Holyoke, CO
Bid Date: Dec 02 2026
Holyoke, CO
Bid Date: Jul 11 2025
Holyoke, CO
Bid Date: May 08 2025
Holyoke, CO
Bid Date: Jul 23 2025
Holyoke, CO
Bid Date: Nov 07 2024
Holyoke, CO
Bid Date: Nov 03 2021
Holyoke, CO
Bid Date: Sep 13 2024
Holyoke, CO
Bid Date: Mar 29 2024
Holyoke, CO
Bid Date: Mar 29 2024
Holyoke, CO
Bid Date: Oct 17 2024
Holyoke, CO
Bid Date: Aug 09 2023
Holyoke, CO
Bid Date: Jun 16 2023
Holyoke, CO
Bid Date: Apr 04 2023
Holyoke, CO
Bid Date: Jun 01 2021
Unlock the Full Project List
Access every active project near you — get started today.
- 825,000+ active commercial projects tracked daily
- Verified contact info for the GC, owner, and architect
- New leads delivered to your inbox every morning
Create your account to get started.
Takes less than a minute — no credit card needed