Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published July 9, 2026 at 8:00 PM
Updated July 11, 2026
Site work, paving and renovation of a road / highway in Lewiston, Maine. Completed plans call for the renovation of a road / highway; for site work for a road / highway; and for paving for a road / highway.
Installation of 2,020 LF 6 inch DI Water Main, 900 LF domestic water services, 3 hydrants, 91 VF 4 foot diameter sanitary manholes, various PVC piping, and asphalt roadway rehabilitation including 1,000 tons of 19.5mm HMA, 750 tons of 12.5mm HMA, and 150 tons of hand-placed pavement. Paving Street Opening Dates:Complete by: 11/15/2027 Start by: 4/1/2027 If work is started in 2026, it must be prepped for over-winter by 11/15/27 Wilson Street, Demi Circle, Bellegarde Ave, Bellegarde Circle Strip & repave entire width Water O Remove existing sidewalk remnants, replace with loam & seed Hamel Street Strip & repave entire width. Remove existing sidewalks & repave on easterly side Demi Circle No temporary water services. Replace existing main in new trench. 6" DI Main (~500 LF) 1 Hydrant Wilson Street, Hamel Street, Bellegarde Ave Stormdrain Temporary water services, replace existing main in same trench 6" DI Main (~1,500 LF) 2 Hydrants Hamel Street Sewer 1 , Type F Catch Basin 12" HP Storm or SDR35 PVC Wilson Street Sewer main removal & replacement (8" SDR35 PVC) SMH removals & replacements Hamel Street SMH removals & replacements Demi Circle SMH removal & replacement Bonds: 5% Bid Bond, Certified Check required, 100% Performance Bond, 100% Payment Bond. Wilson Street Replace the existing 6" unlined cast-iron main with a new 6" ductile-iron main from Lafayette Street to East Avenue. Replace the 10" VCP sewer main with a new 8" PVC main and sewer manholes. Hamel Street Replace the existing 6" unlined cast-iron main with a new 6" ductile-iron main from Sabattus Street to Wilson Street. Remove & replace several sewer manholes & minor stormdrain work. Demi Circle Replace the existing 6" lined & unlined cast-iron main with a new 6" ductile-iron main from East Avenue to Russell Street. In addition, there will be some minor sewer & stormdrain main work. Bellegarde Avenue Replace the existing 6" unlined cast-iron main with a new 6" ductile-iron main from Sabattus Street to Russell Street. In addition , there will be some minor sewer main work. Bellegarde Circle Replace a portion of sewer main , followed by stripping & repaving of the roadway from Bellegarde Avenue to Russell Street. East Avenue Work will include installing sewer manholes at existing dead-end sewer locations, with portion of sewer main replacement. All Questions Due: Wednesday, July 15, 2026 at 12:00 PM i. Submit Questions to Faith Thomas at fthomas@lewistonmaine.gov
GC Bidding
$1,300,000.00
Public - City
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Multiple Locations, Lewiston, ME
Related To This Project
Lewiston, ME
--
Lewiston, ME
--
Lewiston, ME
--
Lewiston, ME
--
Lewiston, ME
Bid Date: Jul 21 2026
Lewiston, ME
Bid Date: Jun 09 2026
Lewiston, ME
Bid Date: Jun 01 2026
Lewiston, ME
Bid Date: Apr 24 2026
Lewiston, ME
Bid Date: Jun 09 2026
Lewiston, ME
Bid Date: Apr 07 2026
Lewiston, ME
Bid Date: Apr 22 2026
Lewiston, ME
Bid Date: Apr 21 2026
Lewiston, ME
Bid Date: May 19 2026
Lewiston, ME
Bid Date: Jun 09 2026
Lewiston, ME
Bid Date: Apr 28 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
