Published March 13, 2026 at 8:00 PM

Updated May 15, 2026

Site work for a clubhouse / community center in Mount Vernon, Maine. Completed plans call for site work for a clubhouse / community center.

The work involves Community Center ADA Access Improvements - Site Work Package, including relocation, demolition/removal, site preparation, restoration, and paving/walkway work at the Mount Vernon Community Center, 2 Main Street, Mount Vernon, ME. Qualified contractors/vendors are invited to submit proposals for site work supporting ADA access improvements at the specified location. Provide all labor, materials, equipment, coordination, and disposal to complete the following items as applicable: 1. Relocation of obstructions in the work area, which includes generator and propane tanks and related appurtenances (if required/approved). Elevate generator 20". Remove any large rocks, shrubs etc. that are in the way of the new walkway that parallels the road. 2. Demolition, removal, and disposal/haul-off of the existing ramp and related materials. 3. Repair any damage to the building where the existing ramp meets the building. 4. Earthwork/site preparation for the new ADA route/ramp interface (grading, subbase prep, stabilization as needed). 5. Restoration of disturbed areas (e.g., loam/seed, stabilization, erosion control, and safe finished condition) 6. Paving/walkway work, including paving/patching and a durable walkway connection from the ramp area to two handicapped accessible parking spaces.

Post-Bid

Clubhouse / Community Centers

$100,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
104
Active Projects
39
Bidding Soon
426
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 20, 2026

June 16, 2026

Project location map

2 Main St, Mount Vernon, ME

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.