Published November 6, 2025 at 7:00 PM
Updated November 7, 2025
Renovation of a transportation facility in Portland, Maine. Completed plans call for the renovation of a transportation facility.
Removal of existing roofing membrane, insulation, cap flashing, disposal of all materials, general conditions, logistics, waste removal, protection of work area from weather, projection from blowing materials, general and special conditions for working at a secure airport, installation of new roofing vapor barrier, new insulation, modified bituminous roofing membrane, drains, cap flashing, sealants and all other related work for a complete roof replacement in its entirety and ready for owner acceptance. Work also included removal and disposal of an existing skylight and infill with framing, finish work and associated roofing. Note the work is within and adjacent to the sterile and secured areas of the Jetport Terminal/Apron and is under TSA screening and security requirements. As a result, work will require security precautions, close coordination with Jetport Operations, TSA, Security, Management, and will involve work limitations affecting the contractor's work including but not limited to inspections for regulatory agencies, sequencing work as directed, restrictive work area, limitations on materials/operations areas, contractor badging and background checks, height limitations of equipment, daily waste removal, relocation of a equipment as directed, FOD (foreign object debris) management and related activities working within a active commercial airport. The Contractor shall be flexible for timing and sequencing and shall fully cooperation with the Jetport Authorities. This work shall be considered incidental and a requirement to the Contractors bid and work. Refer to other contract provisions for additional requirements and considerations. Once the contractor mobilizes the area of work must be completed start to finish compliant with contract documents. Liquidated damages will not be assessed, however, if this date is not achieved due to the critical nature of the airport operations the owner reserves the right to withhold money from the Contractor until such work is completed to the satisfaction of the owner. Question Deadline 10/14/2025 at 12:00 PM ET Questions may be mailed, e-mailed to krc@portlandmaine.gov or faxed to 207-874-8652.
Bid Results
Transportation Terminals
$1,979,813.00
Public - Federal
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 30, 2025
December 1, 2025
1001 Westbrook St, Portland, ME
Related To This Project
Portland, ME
--
Portland, ME
Bid Date: Oct 30 2025
Portland, ME
Bid Date: Nov 05 2025
Portland, ME
--
Portland, ME
Bid Date: Oct 29 2025
Portland, ME
Bid Date: Sep 22 2025
Portland, ME
Bid Date: Oct 22 2025
Portland, ME
Bid Date: Oct 16 2025
Portland, ME
Bid Date: Oct 23 2025
Portland, ME
Bid Date: Oct 01 2025
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.