Published January 7, 2020 at 7:00 PM

Updated June 19, 2025

Site work, paving and new construction of a civil project in Ward, Colorado. Completed plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; and for the construction of a bridge / tunnel.

PROJECT DETAILS: CO FLAP 102(1) & FTFS 112(2), Brainard Lake Road and Bridge This project is located in Arapaho Roosevelt National Forest , Boulder County, Colorado. This project includes reconstruction and widening of 2.52 miles of Brainard Lake Road, as well as rehabilitation of a concrete bridge. The project consists of grading, drainage, asphalt pavement pulverization, aggregate base, asphalt pavement, signing, striping, new guardrail, replacement of concrete wingwalls and a precast girder, and epoxy overlay of Brainard Lake Bridge. Type of Construction: grading, widening, asphalt pulverization, drainage, aggregate base, asphalt paving, prefabricated bridge elements, cast in place concrete wingwalls, erosion control, signing and striping, and temporary traffic control. This project consists of: Schedule A: Clearing, grading, Pulverization and paving 2.52 miles of Brainard Lake Road. Significant Items for Schedule A Include: 6.1 miles of slope and grade finish staking, 3,700 LF of silt fence; 700 LF of sediment logs; 11 acres of clearing and grubbing; 32,000 CY of roadway excavation; 1200 cuyd of waste; 18,650 CY of waste, 8,150 tons of aggregate base: 1.5 miles of 24' wide asphalt pulverization; 6,850 tons of asphalt paving; 1,300 LF of pipe culvert placement; 725 lnft of concrete curb; 225 LF of guardrail; 14,800 sqyd of placing conserved topsoil; 7 acres of seeding and bonded fiber matrix; 106,000 lnft of waterborne pavement markings; 1,600 flagger hours ; 800 pilot car hours Option X: Minor bridge rehabilitation of Brainard Lake Bridge Significant Items for Option X include: 40 cuyd of excavation ; 30 cuyd of structure backfill; 1- Removal of precast concrete box girder; 1-placement of new concrete box girder; 21 tons of asphalt paving; 11 cuyd of structural concrete; 39 lnft of remove and reset bridge rail; 91 sqyd of concrete overlay (thin bonded epoxy); 10 lnft of remove and reset stone masonry wall; Estimated total cost for Schedule A and Option X is $3 to $5 million Contracting Office Address: 12300 West Dakota Avenue Lakewood, Colorado 80228 Place of Performance: Arapaho & Roosevelt National Forest Boulder County, Colorado United States Primary Point of Contact.: Sheri Muehl, Contracting Officer sheri.muehl@dot.gov Phone: 7209633351 Secondary Point of Contact: Jeremiah B. Rogers, Contracting Officer jeremiah.rogers@dot.gov Phone: 7209633717 The contract completion date is July 31, 2018.

Occupancy

Bridges / Tunnels

$3,377,526.00

Public - Federal

New Construction, Paving, Site Work

162

1

20

9

Subscribe For Documents

37 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
68
Active Projects
0
Bidding Soon
883
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 11, 2017

December 8, 2017

Project location map

Brainard Lake Rd, Ward, CO


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.