BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 2, 2020 at 8:00 PM

Updated December 19, 2024

Site work and paving for a sidewalk / parking lot in Tarpon Springs, Florida. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

**As of October 2, 2020, the project has been awarded for $71,583.50.** The project consists of construction of approximately 900 feet of new sidewalk on the east side of Spring Boulevard in Tarpon Springs, Florida between Lemon Street and Lime Street. The project includes sidewalk construction, minor curb and driveway work, and a small number of trees to be removed and replaced with new plantings, private irrigation system repair and adjustments, and general restoration.Sidewalk from W. Lime St. to W. Lemon St. Tuesday, June 16, 2020 @ 3:00 P.M. Bid Bond Performance & Payment Bonds: N/A

Award

Sidewalks / Parking Lot

$71,584.00

Public - City

Paving, Site Work

17

12

2

5

Subscribe For Documents

36 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
56
Active Projects
2
Bidding Soon
974
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 3, 2020

July 3, 2020

Project location map

S Spring Blvd, Tarpon Springs, FL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.