Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Create your *free account*
Fill in a few details to keep viewing projects.
You've used your *free project views*
Register today to keep viewing commercial construction projects bidding in your area.
With ConstructConnect Project Intelligence, you can:
- Filter 825,000+ active commercial projects down to the ones that fit your trade and area
- Reach the right people with contact info for 575,000+ construction companies
- See who's bidding before you put in the hours
- Get daily email updates and alerts on the projects you're watching
Published July 15, 2021 at 8:00 PM
Updated January 26, 2024
Site work and new construction of a municipal facility in Tarpon Springs, Florida. Working plans call for the construction of a municipal facility; and for site work for a municipal facility.
The City of Tarpon Springs Public Works Department has developed documents to relocate the existing organic (yard) waste recycling center operations to the Tarpon Springs Closed Class III Landfill located at the intersection of Meres Boulevard East and South Levis Avenue. The project includes a new pre-engineered modular scale house, relocated scale, a new crushed concrete driveway and parking area. In addition, the existing rock roadways on the Landfill are proposed to have routine maintenance performed on them as part of this project. Located within the construction limits of this project, the new pre-engineered modular scale house will feature a restroom, walk-up window with horizontal self-closing slider, metal roof with pre-finished interior and exterior, electrical and plumbing for a sink and counter for a break area, complete HVAC and vinyl flooring throughout. The project also includes four (4) parking spaces adjacent to the scale house and associated sidewalk. In addition to parking, other site improvements include grading, a stormwater management system and utilities. The stormwater management system consists of a lined dry retention pond with a concrete overflow weir and effluent filtration system. A new on-site lift station will serve the scale house, with new force main connecting to an existing discharge force main located at the existing organic waste recycling center. Potable water will be provided via new water main service line and connection into the existing water main on Meres Boulevard East. The project also includes bid alternates to address additional safety and landscaping improvements on Meres Boulevard including crosswalk striping and sidewalk installation as shown in the plans. FDEP ERP exemption and Landfill Permit modification are pending. The City reserves the right to accept or reject any and all bids/proposals or parts of bids/proposals, waive minor informalities, and request rebids/resubmittals on the material or services described in the ITB/RFP. The City reserves the right to waive minor informalities. Solicitation Number - 31085, H4205019 Question period has changed: TO: Not later than, Wednesday, June 2, 2021
Final Planning
Municipal
$722,580.00
Public - City
New Construction, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Unlock the Full Project List
Access every active project near you — get started today.
- 825,000+ active commercial projects tracked daily
- Verified contact info for the GC, owner, and architect
- New leads delivered to your inbox every morning
Create your account to get started.
Takes less than a minute — no credit card needed