BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work and paving for a sidewalk / parking lot in Lake Forest, California. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

As of October 20,2020 the Contract was awarded to Model Builders Inc for $9,876.54. The construction start date is TBD. In general, this project is intended to upgrade one ADA ramp to current ADA ramp standards. The term of this Contract shall be from August 3, 2020 to August 14, 2020 (10 Working Days from Notice to Proceed, this excludes the period of time required to purchase the materials The City will issue a separate contract for Accessible Pedestrian Signals, however, the ramp shall be completed prior to the APS installation. The Contractor will execute the work and notify the City, so that the City can coordinate with the other Contractor. The contractor shall provide a price per each ADA ramp, which price shall include full compensation for furnishing all labor, materials, and for doing all the work involved in the design and construction of a compliant ADA ramp at the SE corner of El Toro Road and Muirlands Boulevard. The Contractor shall submit their ramp design to the City for approval. Payment: 100% Performance: 100% Liquidated Damages: $500.00 per calendar day Online Q&A: Yes Q&A Deadline: July 24, 2020 5:00PM

Award

Sidewalks / Parking Lot

$9,877.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

29 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
239
Active Projects
113
Bidding Soon
2,444
All Active Projects
1,091
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 31, 2020

August 3, 2020

img_map_placeholder

El Toro Rd & Muirlands Blvd, Lake Forest, CA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.