Published February 23, 2021 at 7:00 PM

Updated February 14, 2025

Demolition and site work for a municipal facility in Springfield, Vermont. Completed plans call for the demolition of a 277,000-square-foot municipal facility; and for site work for a municipal facility.

Within three (3)days of execution of the Contract, the Contractor shall provide to Owner a Performance Bond and Payment Bond issued by a United States Treasury Department listed bonding company, each in the full amount of the Contract price. Such bonds shall provide for the faithful performance of the Contract, including, but not limited to, changes or modifications thereto, all corrective and warranty obligations of this Contract and payment for all labor, services, tools and equipment (including rental thereon), materials,suppliesand disposal.Premiums on said bonds are to be paid by the Contractor and shall be included as a separate line item in the cost estimate. demolition is $2,200,000-$4,500,000. If you have questions, they must be submitted in writing to Dan Voisin at dvoisin@stone-env.comand arrive no later than November 25, 2020, by 5:00 PM Springfield Regional Development Corporation (SRDC, the Owner), Stone Environmental, Inc. (Stone, Owner's Agent) is seeking proposals for the abatement, demolition,and disposal of former Jones and Lamson buildings located at 160 Clinton Street in Springfield, Vermont (the Property). As indicated in the Contract Drawings and Specifications, the scope of the proposed work includes abatement of hazardous materials, demolition of existing buildings to the existing slab-on-grade floor and miscellaneous site work at the "Former Jones and Lamson Facility" located at 160 Clinton Street in the Town of Springfield, Vermont ("Site"). The scope of work includes bulk loading a significant portion of the buildings as asbestos containing materials per the Asbestos Abatement Work Plan due to the condition of the buildings. The Asbestos Abatement Work Plan is included as an attachment to Section 02051 - Asbestos Abatement. The property is approximately 9.5 acres and includes a former manufacturing facility (currently vacant), a separate boiler house, pump house, powerhouse, and storage sheds. The Black River is to the east of the buildings. The manufacturing facility has been vacant since 1985 and is deteriorating and in poor condition. See the Structural Reports by Heritage Engineering included as part of Appendix A for additional information. The overall building complex is approximately 340,000 square feet. The southern 80,000-square feet of the building (1979 addition) resides on a separate parcel (i.e., 200 Clinton St.) and is occupied with an active business. The building will be separated from the 200 Clinton St. portion and a portion of the northern section of the complex will not be demolished as shown on Sheet C-4 of the Contract Drawings. Approximately 277,000 square feet will be demolished under this project. The first building of the complex was constructed in 1907 with several expansions over the years through 1979. The buildings are primarily is slab on grade with a small basement portion along the eastern side of the complex. The buildings mainly consist of steel frames, brick, and concrete. Steel columns and concrete footings support the roofing systems and the roofing consists of steel frames, trusses and concrete panels. The concrete panels support the roofing material. The building has a substantial amount of glass windows on all sides. Site photographs and historical plans have been included in Appendix B."

Award

Municipal

$4,500,000.00

Public - County

Demolition, Site Work

51

24

6

3

Subscribe For Documents

28 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
468
Active Projects
265
Bidding Soon
3,342
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 22, 2021

March 23, 2021

Project location map

160 Clinton St, Springfield, VT

Related To This Project