BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 18, 2021 at 7:00 PM

Updated January 3, 2025

Site work for a civil project in Burlington, Vermont. Completed plans call for site work for a road / highway.

Location: Beginning at a Point on Us Route 7 in South Burlington at Green Mt Dr (Th#139) Intersection (Mm 0.526) and Extending Northerly Along Us Route 7 to the Swift Street Intersection (Mm 1. 738) in South Burlington. Replacement of Existing Traffic Signal Systems at the Intersections Of Us Route 7 and Green Mountain Drive, Mcintosh Avenue, Baldwin Avenue, Laurel Hill Drive, Brewer Parkway, Queen City Park Road, and Swift Street. Replacement Shall Include Replacement of Existing Traffic Signal Span Wires With Mast Arm Poles, Installation of New Traffic Signal Heads, Traffic Signal Cabinet and Controllers, Preemption Systems, Stop Bar And Advanced Vehicle Detection, Pedestrian Signal Equipment, Luminaires, Bracket Arms, Signage, and Other Related Traffic Signal Equipment. Questions Due Prior to 4:30 pm - 12/9/20 Questions : During the advertisement period for this proposal, all questions shall be addressed solely to the Office of Contract Administration via e-mail: AOT.ConstructionContractingInquiry@vermont.gov Electronic bid bond to be submitted in the amount of 5% of the Contractor's bid. Engineer's Estimate: For this proposal the Engineer's Estimate is Category D ($1,000,000 - $2,500,000 ) During the advertisement period for this proposal, all questions shall be addressed solely to the Office of Contract Administration via e-mail: AOT.ConstructionContractingInquiry@vermont.gov All bidders on this project must hold both current annual Prequalification with the Vermont Agency of Transportation through the "Contractor's Experience Questionnaire and Financial Statement" and unconditioned project-specific approval through the "Standard Form - Request for Proposal" CA-82 form. The right is reserved to reject any or all bids, to waive any formality and any and all technicalities in bids and to accept such bids as may be deemed in the best interest of the awarding agency. Vtrans - Shelburne-South Burlington NHG SGNL(51) C/2 MBE - 0.8% WBE- 6.9%

Award

Roads / Highways

$2,999,164.00

Public - State/Provincial

Site Work

83

7

Subscribe For Documents

22 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
349
Active Projects
170
Bidding Soon
2,144
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 18, 2020

February 16, 2021

Project location map

US-7, Burlington, VT

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.