BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 13, 2025 at 7:00 PM

Updated January 14, 2025

Demolition, site work, new construction and renovation of a civil project in Burlington, Vermont. Conceptual plans call for site work for a water / sewer project; for the demolition of a water / sewer project; for the construction of a water / sewer project; and for the renovation of a water / sewer project.

Plans call for two bonds totaling $225 million in March 2025. $204 million is to go towards upgrading the wastewater system, replacing aging machines, building additional tanks. $30 million to purchase a new filtration devise to reduce the amount of phosphorus going into the lake. $30 million to close the treatment plant on Riverside Avenue. $21 million drinking water bond to decommission the pump house on Main Street and build a new one on the same lot with upgrades. As of January 13, 2025, this is a bond that is to go out to the voters for approval in March 2025. A timeline for design and construction is not available. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Conceptual

Water / Sewer

$225,000,000.00

Public - City

Demolition, New Construction, Renovation, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
349
Active Projects
170
Bidding Soon
2,144
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 2, 2026

Project location map

To Be Determined, Burlington, VT

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.