Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published February 26, 2022 at 7:00 PM

Updated October 23, 2024

Demolition, site work, remodeling, renovation and addition to a mixed-use development in West Palm Beach, Florida. Completed plans call for the addition of a educational facility; for the demolition of a educational facility; for the remodel of a educational facility; for the renovation of a educational facility; and for site work for a educational facility.

Construction Management Services required for the completion of the Core Expansion project at Seminole Trails Elementary School consisting of: a building addition to increase dining and kitchen areas; remodel core related spaces including clinic, administration, and exterior corridor access; and associated parking and site modifications as required. On Subcontracts where the Bid exceeds $100,000, the CONSTRUCTION MANAGER may require Subcontractors to provide a 100% Performance Bond and a 100% Labor and Material Payment Bond from a Surety Company authorized to do business in the State of Florida by the Department of Insurance. Costs for such bonds or other forms of surety shall be reimbursed by the OWNER in the GMP. Construction shall incorporate all of the requirements set forth in the Permitted Construction Documents, School District of Palm Beach County Master Specifications, District Design Criteria, State Requirements for Educational Facilities (SREF) 2014, Florida Administrative Code (FAC) Chapter 6A-2 and Florida Building Code. The CONSTRUCTION MANAGER shall prepare all Project Documents in accordance with the requirements stated in Department of Education's Chapter 6A-2, SREF and FAC. The Proposer acknowledges the right of the OWNER to reject any or all Proposals and to waive any informality or irregularity in any Proposal received. In addition, the Proposer recognizes the right of the OWNER to reject a Proposal if the Proposer failed to furnish any required Proposal security, or to submit the data required by the Proposal Documents, or if the Proposal is in any way incomplete or irregular; to reject the Proposal of a Proposer who is not in a position to perform the Contract; and to re-advertise for other or further Proposals or to accept the next responsive Proposal.

Post-Bid

Educational

$2,690,000.00

Public - County

Addition, Demolition, Remodeling, Renovation, Site Work

13

6

2

3

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
298
Active Projects
107
Bidding Soon
1,770
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 25, 2022

May 30, 2022

Project location map

4075 Willow Pond Rd, West Palm Beach, FL

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed