Published April 1, 2021 at 8:00 PM

Updated October 1, 2024

Renovation of an educational facility in South Burlington, Vermont. Completed plans call for the renovation of a educational facility.

**As of 4/1/2021 The project was awarded to Engleberth Construction. They have already started. The work generally consists of the installation of a positive ventilation system for the Gertrude E. Chamberlin Elementary School. The scope of work includes, but is not limited to, the following: selective demolition, installation of new ventilation systems to serve all classroom spaces, closure and infill of the unit ventilator openings in the façade, miscellaneous mechanical and electrical work, and potential removal of regulated materials. The project includes a Base Bid. Prevailing wage rates apply. Contractors must be bonded and insured to the level indicated in the Contract Documents. A Federal DBE participation goal is included in the Contract. Technical questions shall be directed to Nadia Melim, The Jones Payne Group, Inc. via e-mail: nmelim@jonespayne.com. Persons with disabilities who require assistance or special arrangements to participate in any pre-bid site visits are encouraged to contact the Airport at (802) 863-2847 at least 72 hours in advance so that proper arrangements can be made. Each bid must be accompanied by a certified check or bid bond, in the amount of five percent (5%) of the total maximum bid price for the contract in the form and subject to the conditions provided in the Bid Documents It is the intention of the Owner to issue a notice-to-proceed for this work upon execution of the contract and to have construction be completed during the summer of 2021. Bidders are to ensure they have fulfilled the annual requirement of pre-qualification with the City of Burlington by submitting the City of Burlington's Pre-Qualification of Construction Contractors Application form to the Director of Engineering, Larry Lackey, Burlington International Airport, 1200 Airport Drive, South Burlington, Vermont 05403, or LLackey@btv.aero. This form must be submitted five (5) days before this bid is due (unless the bidder has already fulfilled this annual requirement). In addition to the City of Burlington Pre-qualification, each bidder shall furnish the completed Statement of Bidder's Qualifications form (see Bid Documents) at the time of bid opening This project utilizes race-conscious DBE procedures. The DBE goal for this project is 3.37%.

Under Construction

Educational

$1,650,912.00

Public - City

Renovation

76

27

10

4

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Quality Requirements, Regulatory Requirements, References, Definitions, Quality Control, Contractor Quality Control, Testing and Inspecting Services, Temporary Facilities and Controls, Construction Facilities, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cutting and Patching, Cleaning and Waste Management, Closeout Submittals, Maintenance Data, Bonds, Warranties, Project Record Documents, Commissioning
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Selective Structure Demolition
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Concrete Unit Masonry
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Cold-Formed Metal Framing, Metal Fabrications
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Sheathing, Architectural Woodwork, Wood Frames
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Thermal Protection, Air Barriers, Membrane Roofing, Fire and Smoke Protection, Applied Fireproofing
Division 08 - Openings

Division 08 - Openings

Doors and Frames, Metal Doors and Frames, Hollow Metal Doors and Frames, Wood Doors, Flush Wood Doors, Windows, Hardware, Door Hardware, Louvers and Vents, Vents
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Supports for Plaster and Gypsum Board, Suspension Systems, Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Terrazzo Flooring, Carpeting, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Interior Specialties, Partitions
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, Hangers and Supports for Plumbing Piping and Equipment, Plumbing Insulation, Plumbing Piping and Pumps, Facility Water Distribution, Domestic Water Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Hangers and Supports for HVAC Piping and Equipment, Testing, Adjusting, and Balancing for HVAC, HVAC Insulation, Duct Insulation, Instrumentation and Control for HVAC, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Piping, Hydronic Pumps, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, Air Duct Accessories, Dampers, Flexible Ducts, HVAC Fans, Air Outlets and Inlets, HVAC Air Cleaning Devices, Central HVAC Equipment, Decentralized HVAC Equipment, Decentralized Unitary HVAC Equipment, Split-System Air-Conditioners, Convection Heating and Cooling Units
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Hangers and Supports for Electrical Systems, Vibration and Seismic Controls for Electrical Systems, Commissioning of Electrical Systems, Low-Voltage Electrical Distribution, Lighting
Division 27 - Communications

Division 27 - Communications

Communications
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Electronic Detection and Alarm, Fuel-Gas Detection and Alarm
Division 31 - Earthwork

Division 31 - Earthwork

Earth Moving, Excavation and Fill, Excavation, Fill, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving
Division 33 - Utilities

Division 33 - Utilities

Water Utilities, Water Utility Distribution Piping
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment, Piece Material Handling Equipment, Lifting Devices, Clamps
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
196
Active Projects
97
Bidding Soon
1,487
All Active Projects
711
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 16, 2021

March 29, 2021

img_map_placeholder

262 White St, South Burlington, VT

Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Gertrude E. Chamberlin Elementary School Positive Ventilation Project

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.