Published May 19, 2021 at 8:00 PM

Updated September 17, 2025

Site work for a water / sewer project in Akron, Ohio. Completed plans call for site work for a water / sewer project.

The Deadline for City Issuance of Responses to Questions shall be revised to May 13, 2021 at 11:00 am local time The purpose of this project is to repair or replace degraded areas of the sanitary sewer system. The work will be completed by trenchless cast in place or spray applied pipe lining, and excavated point repairs, replacement, or realignment of existing sewer infrastructure. Locations of the necessary repairs were identified by prioritizing defects identified by close circuit television inspection of sewers as required by the Citys Capacity Management Operation and Maintenance (CMOM) Program. The assets are filtered for criticality and potential for failure. Work is coordinated with the resurfacing program and lead water service connection replacement program. City of Akron Local Goal: 18% EDGE/DBE/MBE/WBE/SBE/VBE (minimum 3% WBE) EPA Goals: 1.3% MBE and 1.0% WBE Disadvantaged Business (DBE) participation goals (subcontracts, materials, supplies) have been set on this Project for those certified as DBE's in accordance with a federal agency such as the Small Business Administration or the Department of Transportation or by an approved State of Ohio agency. The Unified Certification Program (UCP) administered by the Ohio Department of Transportation (ODOT) can provide necessary DBE certifications. This procurement is subject to the Environmental Protection Agency (EPA) policy of encouraging the participation of small businesses in rural areas (SBRAs). For the purpose of this Project, the Minority Business Enterprise (MBE) Utilization goals shall be defined as contractors and/or subcontractors with MBE's for the minimum amount of 1.3% of the Contract Price; and the Women's Business Enterprise (WBE) Utilization goals shall be defined as contractors and/or subcontractors with WBE's for the minimum amount of 1.0% of the Contract Price. Each Proposal must include a detailed plan to meet or exceed the City's local EDGE/DBE/MBE/SBE/VBE/WBE firm goals and the EPA diversity inclusion goals set forth above. The final agreed upon plan will be attached to the Agreement as an exhibit and the selected Proposer shall be obligated to comply with said plan. The City of Akron is committed to ensuring that individuals with disabilities are able to fully participate in public programs, services, and activities. Anyone who is in need of an accommodation from any City department is invited to contact Donald Rice, Director of Human Resources, 166 South High Street, Municipal Building, Suite 103, Akron, Ohio 44308, (voice) 330-375-2780 as soon as possible. If you require TDD phone service call Ohio Relay at 800-750-0750 and they will assist in contacting the Department of Human Resources at (330) 375-2780. All contractors and subcontractors involved with the project will, to the extent practicable, use Ohio products, materials, services, and labor in the implementation of their project. Domestic steel use requirements as specified in Section 153.011 of the Ohio Revised Code apply to this Project. Copies of Section 153.011 of the Ohio Revised Code can be obtained from the Ohio Department of Administrative Services. Except as provided in Section 102.07 of the City of Akron, Construction and Materials Specifications, 2008 Edition, each proposal must be accompanied by a certified check in the sum of 5% of bids on a solvent bank, or a bid bond in like amount, acceptable to the City of Akron, as a guarantee, that if the proposal is accepted, a contract will be entered into. Proposals may be held by City for a period not to exceed one hundred twenty (120) days after the date Proposals are opened for the purpose of reviewing the Proposals and investigating the qualifications of Proposers prior to awarding the Agreement. Except as provided in Section 34.09 of the City's Code of Ordinance, the Proposer to whom the Agreement is awarded will be required to furnish a performance and payment bond in the sum of 100% ,of the Contract Price for the faithful performance of the contract. The performance and payment bond shall remain in full effect until Final Completion of the Project. The Director of Public Service reserves the right to reject any or all bids, and to waive informalities.

Post-Bid

Water / Sewer

$5,195,297.00

Public - City

Site Work

83

8

35

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
276
Active Projects
141
Bidding Soon
1,624
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 21, 2021

June 28, 2021

Project location map

Multiple Locations, Akron, OH

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.