BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 11, 2022 at 8:00 PM

Updated January 25, 2024

Site work and paving for a sidewalk / parking lot in Niagara, Wisconsin. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

**As of June 30, 2021, the project has not been awarded yet. A timeline for award has not been established yet. The work, in general, will include the approximate quantities and items listed below: Contract B-21: 15,500 SF - Concrete Sidewalk/Driveways, 100 LF - Profile Cut Curb and Gutter, 360 SY - Hot Mix Asphalt Pavement, 450 CY - Common Excavation, 340 CY - Crushed Aggregate Base Course, Pavement Marking, Landscape Restoration, and Traffic Control. The project is funded in part with a federal Community Development Block Grant. Federal Davis-Bacon Act wage rates are applicable to this project per Federal Labor Provisions (4010). Attention of bidders is particularly called to the requirements as to condition of employment to be observed and minimum wage and fringe rates to be paid under the contract, Section 3, Segregated Facility, Section 109 and E.O. 11246. We encourage MBEs, DBEs, and WBEs to submit bid proposals. The solicitation of subcontractors must evidence a good faith effort to obtain bids from MBEs, DBEs and WBEs, such efforts to be documented.

Award

Sidewalks / Parking Lot

$372,336.00

Public - City

Paving, Site Work

46

15

2

6

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Summary of Work, Work by Owner, Price and Payment Procedures, Allowances, Cash Allowances, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Quality Control, Testing and Inspecting Services, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Temporary Controls, Temporary Erosion and Sediment Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Closeout Submittals, Bonds, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Subsurface Investigation, Material Testing, Demolition
Division 03 - Concrete

Division 03 - Concrete

Precast Concrete, Precast Structural Concrete
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry, Stone Assemblies
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Wood, Plastics, and Composites, Common Work Results for Wood, Plastics, and Composites
Division 09 - Finishes

Division 09 - Finishes

Wall Finishes, Stone Facing
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

HVAC Air Distribution, HVAC Ducts and Casings
Division 26 - Electrical

Division 26 - Electrical

Lighting
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Site Clearing, Earth Moving, Grading, Fine Grading, Finish Grading, Excavation and Fill, Subgrade Preparation, Excavation, Dewatering, Fill, Backfill, Compaction, Embankments, Erosion and Sedimentation Controls, Special Foundations and Load-Bearing Elements, Driven Piles, Bored Piles, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Watering, Bases, Ballasts, and Paving, Rigid Paving, Curbs and Gutters, Site Improvements, Retaining Walls, Segmental Retaining Walls, Planting, Planting Preparation, Mulching, Turf and Grasses, Seeding, Plants, Trees
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Cranes and Hoists
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
18
Active Projects
6
Bidding Soon
134
All Active Projects
57
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 17, 2021

July 19, 2021

img_map_placeholder

Multiple Locations, Niagara, WI


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.