BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work, renovation and addition to a mixed-use development in Cedar Bluffs, Nebraska. Working plans call for the addition of a educational facility; for the demolition of a educational facility; for the renovation of a educational facility; and for site work for a educational facility.

The owner has determined a prequalified list of construction managers. Following the opening of proposals, the proposals will be evaluated, the construction manager at risk candidates ranked in order of preference, and a contract negotiated and approved according to School policy. The Project generally consist of the following: Additions and renovations consisting of cafeteria, kitchen, library, and office space/storage area expansions, or other additions and/or renovations as determined by the Architect's master planning services to the existing PK-12 school facility located at 110 E. Main Street in Cedar Bluffs, Nebraska. ("Project"). PROJECT TEAM. The Project Team will consist of the following: School's Designated Representative. Harlan Ptomey, Superintendent of Schools, Cedar Bluffs Public Schools, 110 E. Main Street, Cedar Bluffs, NE 68015. School's Legal Counsel. Derek A. Aldridge, Perry, Guthery, Haase & Gessford, P.C., L.L.O., 233 South 13th Street, Suite 1400, Lincoln, NE 68508. Project Architect. Beringer Ciaccio Dennell Mabrey, Inc. d/b/a BCDM Architects, 1015 North 98th Street, Suite 300, Omaha, Nebraska 68114, 402-384-6404; the Project Architect's designated representative on the Project Team is Matthew Erion SCOPE OF CM@R WORK. Stated generally herein, the CM@R services for the Project will include normal and customary construction management at risk services as outlined in Appendix C to be provided during the pre-construction, construction, and close-out phases of the Project, including the following: Preconstruction Phase Services: The CM@R will work cooperatively with the other members of the Project Team, and will provide, among other services, cost estimating, budgeting, value engineering, constructability review, scheduling, and preconstruction planning throughout the preconstruction stages, as provided in the Agreement. The CM@R will provide a Guaranteed Maximum Price ("GMP") for the Project as provided in the Agreement. Construction Phase Services: The CM@R shall be responsible to construct the Project pursuant to the construction documents and in accordance with the schedule requirements. The CM@R shall be the primary contracting party on all subcontracts and shall be fully responsible for the means and methods of construction, project safety, project completion within the schedule agreed upon in the preconstruction phase, compliance with applicable laws, and submitting monthly reports of these activities to the School. Subcontracts and any self-performed work will be awarded by the CM@R to qualified vendors using a competitive process, unless specifically allowed in writing by the School. The selected CM@R shall be required to procure and maintain insurance, payment and performance bonds and a GMP guarantee bond, as required by law and the Agreement Scope of Project: The proposed project will involve the following: Additions and renovations consisting of cafeteria, kitchen, library, and office space/storage area expansions, or other additions and/or renovations as determined by the Architect's master planning services. Project Location: The project is located at the Cedar Bluffs PK-12 school facility, 110 E. Main Street, Cedar Bluffs, Nebraska. Budget for Project: The preliminary total project construction budget for all costs for the entire Project is not to exceed One Million Dollars ($1,000,000.00). This project construction budget includes all costs and expenses for the Project, including but not limited to all labor and materials for construction (subcontracted and self-performed), construction manager fees and reimbursable expenses, general conditions/aid-to-construction costs, permits, special testing and any construction contingency. The construction budget does not include any site acquisition costs or architect/engineering fees and reimbursable expenses or owner's contingency. Project Schedule: The preliminary schedule for the Projects are as follows: Event Date Contract execution: September 20, 2021 CMR pre-construction services begin: September 21, 2021 70% Construction Documents: October 22, 2021 Guaranteed Maximum Price: November 12, 2021 Construction begins April, 2022 Substantial Completion: June 1, 2023 Final Completion: July 31, 2023 Deadline for receiving questions/RFI: September 6, 2021(by 2:00 PM)

Final Planning

Educational

$1,000,000.00

Public - City

Addition, Demolition, Renovation, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

4

Subscribe For Documents

28 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
60
Active Projects
33
Bidding Soon
497
All Active Projects
201
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 14, 2021

April 5, 2022

img_map_placeholder

110 E Main St, Cedar Bluffs, NE


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.