BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a mixed-use development in Boyertown, Pennsylvania. Completed plans call for site work for a transportation facility; and water / sewer project.

The Boyertown Transload Phase 1 project includes the construction of 2,340' of new track, a 30'x16'x14' cast in place unloading pit, cast in place and concrete block retaining walls, earthwork and storm drainage. New Drainage a. Catch Basin 2' x 2' x2' high W/ Highway Grate b. Catch Basin 4' x 4' x 4' high W/Highway Grate c. 12" Dia. CMP Galv. 16 gauge d. 18" Dia. CMP Galv. 14 gauge perforated e. 24" Dia. RCP For E-80 Loading Compacted Stone Base (8") Roadway (Milled Material 4") Additional cost to replace Milled with Hot Mix The Contract will be awarded to the lowest responsible bidder who has based their bid in accordance with the Contract Documents. The Contractor, in accordance with Executive Orders 11625 and 12138, must utilize to the greatest extent feasible, minority and/or women owned business concerns which are located within the municipality, county or the general trade area. The Owner reserves the right to reject any or all bids or to waive any informalities in the bidding. Bids may be held by the Owner for a period not to exceed 60 days from the date of opening bids for the purpose of reviewing the bids and investigating the qualifications of bidders prior to awarding the contract. It is the Owner's intent to construct this project in the Winter and Spring of 2021/2022.

Bid Results

Transportation Terminals

$1,526,348.00

Public - County

Site Work

15

9

20

7

Subscribe For Documents

18 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
351
Active Projects
175
Bidding Soon
2,627
All Active Projects
1,286
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 7, 2021

December 29, 2021

img_map_placeholder

E 2nd St & Warwick St, Boyertown, PA

Related To This Project


Stop wasting time. Get and stay ahead of your competition.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.