BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and new construction of a pre-engineered storage facility in Big Stone Gap, Virginia. Working plans call for the construction of a pre-engineered storage facility; and for site work for a pre-engineered storage facility.

As of 01/06/2022 This project was not awarded due to no valid data and does not have information yet whether to rebid the project or not. All Inquiries for Information Should Be Directed To: Megan Sturgill Email: megan.sturgill@energy.virginia.gov Phone: (276) 523-8119 PURPOSE: The Virginia Department of Energy, seeks a qualified contractor to furnish all labor, materials, tools, equipment, vehicles, travel, supervision, parts, and incidentals necessary to provide, deliver and install one new, metal 18x24 carport at 3405 Mountain Empire Road, Big Stone Gap, VA 24219. The contractor shall provide services in accordance with the specifications and terms and conditions set forth in this quick quote SCOPE OF WORK: The contractor shall furnish the following as outlined: a. Provide (1) each new, metal carport with the following specifications: o 18' wide x24' long Regular Style Carport o 9' leg height o 14 gauge tubing (2 1/2 by 2 1/2 square tubing) o Installation Surface = Asphalt o Anchor to existing asphalt o Boxed in eaves o Corner braces o Minimum of 130mph & 35psf certification b. Metal wall plates, connectors, screws, bolts, brackets and exposed to the weather shall be stainless steel or hot dipped galvanized. c. Roof deck screws shall have rubber washers. d. The contractor shall provide all labor, equipment, materials, transportation, and all necessary tools of trade to provide any goods, and to perform services under the resulting contract. e. All equipment furnished under this contract shall be new and the same as the manufacturer's current production model. f. Equipment shall be complete units with all standard items; no deletions. g. Accessories not specifically mentioned herein, but necessary to furnish a complete unit ready for use, shall also be included. Unit shall conform to the best practice known to the body trade in design, quality of material and workmanship. Assemblies, sub-assemblies, and component parts shall be standard for the design. h. The contractor shall be responsible for obtaining any necessary or required permits, and making notification to the local utility company for utility marking prior to installation if required. Upon delivery, the contractor shall setup and install the structure in accordance with any applicable building codes, at the location designated. The Department of Energy will not be liable for any utility damage etc. resulting from the installation of this temporary structure. i. Installation and assembly shall be completed within fourteen (14) business days from the date of delivery. Delivery hours are 8:00 AM to 5:00 PM Monday thru Thursday. Working hours for assembly and installation are 8:00 AM to 5:00 PM Monday thru Thursday except for state holidays. j. Specifications sheets for the make and model of the carport your company intends to provide, shall be attached with your bid, along with warranty information. Bid Results: Item 1 TNT Carports Inc-$2580 Item 2 TNT Carports Inc-$2580

Final Planning

Warehouse / Distribution - Pre-Engineered Storage Building

$5,160.00

Public - State/Provincial

New Construction, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
145
Active Projects
86
Bidding Soon
835
All Active Projects
354
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

December 10, 2021

July 6, 2022

img_map_placeholder

3405 Mountain Empire Rd, Big Stone Gap, VA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.