Site work for a water / sewer project in Tillamook, Oregon. Completed plans call for site work for a water / sewer project.

Scope of Work Improvements generally include the construction approximately 1,018 lineal feet of new water distribution piping consisting of approximately 756 lineal feet of 8-inch C900 PVC piping and approximately 262 lineal feet of 8-inch HDPE water distribution piping being placed using horizontal directional drilling methodology and all associated connections and appurtenances such as fire hydrants, services and connections to complete the installation. Complete installation of the new waterline shall include, but not limited to, trench excavation and backfill, connections to existing system, reconnection of existing services and new services, testing and disinfection of the new system and restoration as required. The Ports Estimates the cost of improvements at $200,000 Completion & Project Timeline It is the intent of the Port of Tillamook Bay to have construction completed by April 15, 2022. Advertisement December 18, 2021 Bid Opening January 14, 2022 Intent to Award January 18, 2022 Board of Commissioner's Approval January 19, 2022 Contract Award January 31, 2022 Work to Begin by February 14, 2022 Work to be completed by April 15, 2022 (60 Calendar Days) Liquidated Damages Liquidated Damages will be assessed at $500 per work day should the Contractor fail to complete the work within the time allowed. Requirements of Bidders No bid will be considered unless fully completed in the manner provided in the Instructions to Bidders, and accompanied by certified check or bid bond (with the authorized surety company) made payable to the Port of Tillamook Bay in the amount of ten (10%) percent of the maximum amount of the bid and no interest will be allowed on bid security. Bid security will be forfeited should the Bidder fail to enter into a contract and provide suitable performance bonding. All bidders must comply with ORS 279C.800 to 279C.870 pertaining to the payment of prevailing rates of wage. The Contractor and Subcontractors shall comply with all prevailing wage requirements. No bid will be received or considered unless the bid contains a statement by the bidder that the bidder will comply with ORS 279C.838 or 279C.840. Bidders shall be licensed with the Oregon Construction Contractors Board as required by ORS 468A.270 prior to submitting a bid for the project. A bid will not be considered unless the bidder is licensed with the Oregon CCB. Bidders shall also comply with the resident bidder status as defined in ORS 279A.120. The Port of Tillamook Bay reserves the right to reject any bid not in compliance with all prescribed public contracting procedures and requirements, including the requirement to demonstrate the bidders' responsibility under ORS 279C.375 (3)(b), and may reject for good cause any and all bids upon finding of the Port that it is in the public interest to do so. The Port also reserve the right to postpone the awarding of the contract for a period of not more than 30 days from the bid opening date. Hold up to three bids determined best by the Port until final award is made provide the Port shall award the contract within 30 days after the bid opening date, and to award to the lowest responsible bidder, with a responsive bid. No bidder may withdraw their bid after the hour set for the opening thereof or before award of the Contract, unless the award is delayed for a period of 30 days. All other communications are also not binding on the contract. Request for clarifications shall be made in writing and a Clarification Addenda will be issued prior to bid opening. Notification The notification of Intent to Award will be made to all responsive bidders contingent upon the approval of the Ports' Board of Commissioners. Protests of bid results and Intent to Award must be in writing, must be by the bidder in good legal standing, must be specific, and must be received within seven (7) calendar days of the date of issuance of the Intent to Award. The protest envelope must give bid title reference and must be addressed to Chance Steffey, PE, Port of Tillamook Bay, 4000 Blimp Blvd., Suite 100, Tillamook, OR 97141. All interested parties are invited to attend. Subcontractor declarations must be delivered to Owner as above no later than 4:00 p.m. on the day of the bid opening. Improvements generally include the construction approximately 1,018 lineal feet of new water distribution piping consisting of approximately 756 lineal feet of 8-inch C900 PVC piping and approximately 262 lineal feet of 8-inch HDPE water distribution piping being placed using horizontal directional drilling methodology and all associated connections and appurtenances such as fire hydrants, services and connections to complete the installation. Complete installation of the new waterline shall include, but not limited to, trench excavation and backfill, connections to existing system, reconnection of existing services and new services, testing and disinfection of the new system and restoration as required.

Award

Water / Sewer

$128,823.00

Public - Federal

Site Work

Subscribe For Documents

32 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
56
Active Projects
27
Bidding Soon
565
All Active Projects
272
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 14, 2022

February 14, 2022

img_map_placeholder

4000 Blimp Blvd, Tillamook, OR


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.