BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Renovation of a mixed-use development in Berkeley, California. Completed plans call for the renovation of a educational facility.

**As of February 14, 2022. The project has not been awarded yet, no timeframe provided. Lab Update: - Selective Demolition. Shoring of fume hood and other exiting systems, protect in place. Concrete chipping with slab scanning. Coordination with UCB PM, Facilities Services, and EH&S related to multiple M/E/P disconnections and disposal of hazardous materials. - Selective replacement of flooring. VCT & LVT Flooring and wall base. Patch and repair floor slabs. Preparation required to achieve manufacturers' warranties. - Prep, patch, and paint all previously painted surfaces throughout, including but not limited to walls, ceilings, doors and frames, window jambs, sills, trim, pipes, conduits, mechanical ductwork. Newly exposed locations also require prep, patch and paint. Labels and signage will remain clearly legible or to be replaced in kind after painting. - Refinishing of existing casework: prep, patch and refinish. - New doors, frames, hardware & glazing. Swinging and sliding doors with associated structural support. - New casework. - New sinks and hardware including eyewash stations. - New flammable storage cabinets at (e) fume hood. - Acoustic mitigation at ceilings, ducts and transfer ducts. - Ventilation modifications. Rebalance Air Flow in project area. - M/E/P scope throughout. Coordination with UCB PM & Facilities Services related to multiple M/E/P disconnections and connections. Coordinate M/E/P connections/hook-ups for new lab equipment. - Accessible path of travel improvements include drinking fountain replacement with related electrical work, cane detection at protruding corridor objects, signage at toilet rooms and replacement of the main entry door to the suite. - New signage. Alternate #1: Remove and replace all VCT flooring in rooms 421, 425, 425a, 425b, and 429. Pricing shall reflect the difference between base bid (partial replacement) and alternate #1. University reserves the right to accept Alternate within 60 days after the date University signs the Agreement. If Alternate is accepted, No extension of time will be granted. *The bid list for this project may be incomplete. If you have been invited to bid on this project by the owner, please notify our editorial staff. Estimated construction cost: $115,000 Contract Time - 75 days Note from Marvin Collins Construction: job walk photos has been issued as of January 11, 2022. the project is an interior renovation of an existing tenant space on the fourth floor of Weill hall. the approximately 1730 square foot suite includes an office, a lab classified as bsl1, and two smaller labs classified as bsl2 and bsl2*. the scope of improvements inside the suite includes: selective replacement of flooring, refinishing of existing casework, new casework, new accessible entry door and doors to bsl2 labs, new sinks in bsl2 labs, new flammable storage cabinets at (e) fumehood, new lab equipment with mep hookups, ventilation modifications, and painting throughout Addendum #1 has been issued, as of January 17, 2022.

Post-Bid

Educational

$115,000.00

Public - State/Provincial

Renovation

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
164
Active Projects
90
Bidding Soon
1,839
All Active Projects
776
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 20, 2022

February 21, 2022

img_map_placeholder

To Be Determined, Berkeley, CA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.